Similar Projects
HVAC and Mechanical Products
Term Contract
Post-Bid

Repair of East Cooling Tower for the City of Columbia Municipal Power Plant
Post-Bid
Columbia, MO 65201

Virginia Avenue Housing Complex, Heat Pump Replacements
Results
$85,500 to $95,000 est. value
Columbia, MO 65201

Kitchen Hoods Inspection and Cleaning
Results
Columbia, MO 65202

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Lange Middle Cooling Tower and Chiller Replacement
Results
Columbia, MO 65202

Data Room HVAC at the Columbia Government Center
Alteration
Post-Bid
Columbia, MO

Ridgeway Elementary HVAC Replacement
Alteration
Results
Columbia, MO 65203

HVAC Services for the Philips Park Pavilion
Addition
Post-Bid
Columbia, MO 65201

Various Locations-Air Handler BAS Upgrades in CCA and UMTH
Alteration
Results
$304,740 to $338,600 est. value
Columbia, MO 65201

Hickman High HVAC Replacement
Renovation, Alteration
Post-Bid
Columbia, MO 65203

Hickman High Penthouse Chiller Replacement
Infrastructure
Results
Columbia, MO 65203

Shepard Boulevard Elementary HVAC Replacement
Alteration
Post-Bid
Columbia, MO 65201

Oakland Middle HVAC Replacement
Alteration
Results
Columbia, MO 65202

Nowlin Middle School Auxiliary Gym And Locker Rooms HVAC
Renovation, Alteration
Post-Bid

Last Updated 02/28/2022 11:43 AM
Project Title

Air Handlers in Room 2E25 Replacement

Physical Address View project details and contacts
City, State (County) Columbia, MO   (Boone County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,885,131 to $2,094,590
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall furnish all labor, materials, tools, equipment necessary for, and incidental to, construction of this project as indicated on Drawings and specified herein. Work shall include everything requisite and necessary to finish work properly, not withstanding that every item of labor or materials or accessories required to make project complete may not be specifically mentioned. Project consists of replacing air handling units within a second-floor mechanical room (2E-25) at the University of Missouri Teaching Hospital. Existing units S1-2, S1-3 and S2-1 will be replaced with new units. Demolition shall consist of removal of existing air handlers, piping, ductwork, electrical and miscellaneous components as needed to accomplish the project. Architectural work shall consist of limited existing brick removal, window removal, and window infill with insulated panels. Structural work shall consist of framing and support as needed for the permanent and temporary units. Mechanical work shall consist of a temporary air handling unit, new air handling units, ductwork, piping, controls, and all other items related to installation of the three new units. Electrical work shall consist of providing heat trace, temporary air handling unit power, new feeders from existing distribution equipment and substations on the ground floor of the hospital, distribution equipment within the mechanical room, and all other items related to installation of the three new units.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents