Similar Projects
2022 Miscellaneous Sanitary and Storm Sewer Improvement
Infrastructure
Bidding
$300,000 est. value
Decatur, IL

Capitol Oaks Sanitary Sewer Rehabilitation Phase 4
Infrastructure
Bidding
$300,000 est. value
O'Fallon, IL

Sanitary, Grease Trap and Storm Basin Pumping, Jetting and Cleaning 20-134-FM
Post-Bid
Wheaton, IL

Playfield Subdivision Phase 3 Sanitary Sewer Rehabilitation
Post-Bid
Crestwood, IL

Sanitary Sewer System Improvements Contract A
Results
Tilton, IL 61833

GPSD Sewer Rehabilitation; Erosion Control, Project 2
Results
Less than $1,400,000 est. value
Peoria, IL 61600

Franklin,Smith South Street Sewer Replacement
Infrastructure
Bidding
$250,000 est. value
Smithton, IL 62285

2021 Water and Sewer Improvements
Post-Bid
Streamwood, IL

Laurel Drive And Susan Court Sanitary Sewer Replacement
Renovation
Results
Caseyville, IL 62208

Sanitary Sewer Manhole Lining
Infrastructure
Bidding
$200,000 est. value
Galva, IL

Sanitary, Grease Trap and Storm Basin Pumping, Jetting and Cleaning
Post-Bid
West Chicago, IL

2020 Manhole Rehabilitation
Renovation
Results
Less than $196,790 est. value
Decatur, IL 62523

Construction of Manhole Lining and Sanitary Sewer Replacement
Infrastructure
Bidding
$300,000 est. value
Ridgway, IL

2021 Lateral Lining - Phase II
Post-Bid
Elmhurst, IL

Cooley-East Street Sanitary Sewer Replacement
Results
Less than $175,600 est. value
Winfield, IL

Last Updated 04/19/2022 09:46 AM
Project Title

2021 Sewer Lining

Physical Address View project details and contacts
City, State (County) McHenry, IL   (McHenry County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Installation of a Cured In Place Pipe (CIPP) liner to be installed within an existing sanitary sewer. Sewer material is 50+ yr old clay pipe. 2. Design of liner system and thickness. 3. Traffic Control. 4. Cement spray-on manhole lining of brick or block manholes. 5. Pouring of concrete bench for selected manholes. 6. Cleaning and televising of the sewers before CIPP liner installation. 7. Post installation televising and deliverables.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents