Similar Projects
Reduce Congestion and Increase Mobility on KY 1297
Infrastructure
Conception
$10,660,000 CJ est. value
Glasgow, KY 42141

Address Pavement Condition of AC Pavement
Infrastructure
Conception
$4,000,000 CJ est. value
Glasgow, KY 42141

Caliber Collison - Abercrombie and Associstion
New Construction, Infrastructure - 14,704 SF
Design
$4,000,000 CJ est. value
Walton, KY 41094

Caliber Collison - Abercrombie and Associstion
New Construction, Infrastructure - 14,704 SF
Design
$4,000,000 CJ est. value
Walton, KY 41094

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Five Star Food Mart / Danville
New Construction, Infrastructure
Sub-Bidding
$700,000 CJ est. value
Danville, KY 40422

Waterline Extensions Contract 2 - Tank Rehab
Infrastructure
Post-Bid
Jackson, KY

Contract 7 - Whitledge Lane Water Main Extension
Infrastructure
Post-Bid
Mount Washington, KY

Baseball Field Backstop Safety System
Results
Union, KY 41091

42" Raw Water Line Rehabilitation at Water Treatment Plant
Infrastructure
Results
Ashland, KY

Florence Apartments
New Construction, Infrastructure
Construction
$25,000,000 CJ est. value
Florence, KY 41042

Stuart Powell Field Airport T-Hangar and Apron Replacement Project
Infrastructure
Construction
$1,899,829 CJ est. value
Danville, KY 40422

Residence Inn by Marriott / Florence
New Construction, Infrastructure - 104,321 SF
Pending Verification
$20,000,000 CJ est. value
Florence, KY 41042

Turfway Foodmart
Addition, Demolition, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Florence, KY 41042

Last Updated 03/14/2023 09:42 AM
Project Title

Elizabeth Joseph Drainage AML Project

Physical Address View project details and contacts
City, State (County) Garrett, KY 41630   (Floyd County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $59,008 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Elizabeth Joseph Drainage site is located at 315 Hoover Hollow, Garrett in Floyd County, KY, 41630. On January 3, 2022, the culvert crossing the property originally installed as part of an OSM reclamation project failed during a heavy precipitation event damaging the citizen's yard and impacting access to the driveway servicing the residence. To address this concern, the failed pipe will be removed and replaced with 48" HDPE pipe with headwalls on the inlet and outlet. The material generated during excavation will be used as an alternate pipe bedding or used onsite to create positive drainage in the yard area. Class II/III stone will be used to further armor erosion prone areas near the headwalls. Revegetation of all disturbed areas will be addressed using standard residential seeding practices. The impacted concrete driveway will be replaced in kind. An allowance for removal, relocation and repair of existing utilities within the work area has been included. No material will be transported to an off-site waste area. The cost estimate for this work also includes bid items for site preparation, hoe ram, filter fabric, and roadway stone to facilitate the construction. In total, the project area encompasses approximately 0.5 acres between the public road (Hoover Hollow) and the citizen's residence as marked on the plans. This project will not address underground mine openings. No trees will be disturbed outside of the unstable landslide area. All areas disturbed by this project will be revegetated by means of standard AML residential seeding practices. Sediment control will be provided by installation of silt checks or silt traps downstream of the work area. Estimated Length of Project: (Substantial Completion) + 45 Calendar Days (Final Completion) All bids shall be accompanied by a bid guarantee (in the form of a bid bond or certified check) of not less than five (5%) percent of the amount of the total bid. A 100% Performance Bond and a separate 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instructions to Bidders and/or General Conditions. Bonds should be executed by a surety company authorized to do business in the Commonwealth of Kentucky. The Division of Contracting & Administration, Commonwealth of Kentucky, reserves the right to reject any and all bids and to waive all informalities and/or technicalities where the best interest of the Commonwealth may be served.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents