Similar Projects
One Stop Shop Building (CCNA)
New Construction - 25,000 SF
Design
Sarasota, FL 34236

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

Construction MAC; Southeast
New Construction, Renovation
Bidding
Less than $48,000,000 est. value

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Bidding
Less than $500,000,000 est. value

D/B Southeast MATOC - Phase 2
Post-Bid
$1,000,000 to $170,000,000 est. value

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Post-Bid
Less than $150,000,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Results

Indefinite Quantity Construction Contract - East Central and Southwest Florida
Results
$2,000,000 est. value

SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

Facility Repair & Renewal (FRR) (MATOC) Phase 1
Post-Bid
Less than $450,000,000 est. value
Washington, DC

Z--Design-Build and Design-Bid-Build Indefinite-Delivery/Indefinite Quantity, Firm-Fixed Price, Roofing Multiple Award Construction Contract for the Florida Panhandle Area of Operation
Results
$150,000 to $6,000,000 est. value

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

IDIQ Multiple Award Task Order Contracts for Horizontal Construction, Renovation, Repair, and Incidental Design In Alabama, Florida, Mississippi, and Georgia
New Construction, Renovation
Post-Bid
$100,000 to $250,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

Region 4 Single Award IDIQ Job Order Construction Contracts (JOCC) for Construction Services In States of AL, FL, GA, KY, MS, NC, SC, & TN
New Construction, Renovation
Design
$2,000 to $5,000,000 est. value

Last Updated 10/15/2021 02:54 PM
Project Title

Phase 3A of the South County Court / RL Anderson Project

Physical Address View project details and contacts
City, State (County) FL   (Sarasota County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Sub-Bidding, Construction Start Expected first quarter 2022, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value Less than $5,901,125
Plans Available from Construction Manager as Contractor (CMc) - 05/12/21
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 3A consists of the following: 1. Procurement and installation of chillers, pumps and related equipment required for Phase 3 (RL Anderson / Annex Bldg. Renovation). 2. Procurement and installation of chilled water piping from the new chillers to the valve entrance point for the Annex and RL Anderson buildings. 3. Procurement of a new air handler and outside air unit for the first renovation phase on the Annex building. Installation of the air handler and outside air unit will be purchased separately and is not part of this RFP. 4. Procurement and installation of a new generator, including underground conduit to connection point to the Annex and RL Anderson buildings.

Details

Misc. Buildings, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents