Similar Projects
Install Operable Folding Partitions in the Building
Alteration
Bidding
$200,000 est. value
Boston, MA 02119

Installation of Student Lockers at Wayland Middle School
Alteration
Bidding
$230,000 est. value
Wayland, MA 01778

Tsongas HVAC Units Replacement - Sub Bid
Alteration
Sub-Bidding
$7,450,000 est. value
Lowell, MA 01852

Biological Safety Cabinets, Cleaning, Certification, Maintenance, Repair and Installation
Post-Bid
Amherst, MA

Furnish and Install Privacy Walls at Boston Fire Headquarters
Post-Bid
Boston, MA

Bathroom Renovations at Lathrop Village
Results
$79,000 est. value
South Hadley, MA 01075

Renovation of Middle School Cafeteria Bathrooms
Results
Less than $175,000 est. value
Watertown, MA 02472

South Worcester Neighborhood Center Interior Renovations / DPWP
Alteration
Bidding
$120,000 est. value
Worcester, MA 01603

Bathroom Tubs
Post-Bid
Less than $140,009 est. value
Brewster, MA 02631

Interior & Exterior Renovations, 14/16 Bedford Court
Results
$65,600 est. value
Concord, MA 01742

Conwell School - Front Wall Re-Siding
Alteration
Bidding
$50,000 est. value
Worthington, MA 01098

Removal and Disposal of Existing Metal Lockers and Install New Heavy Duty Metal Corridor Lockers
Post-Bid
Dorchester, MA

Crocker Hall Stairway Improvements
Results
Less than $55,000 est. value
Framingham, MA 01702

Lederle Graduate Research Center Drywall Installation and Finish
Alteration
Bidding
$30,000 est. value
Amherst, MA 01003

Purchase of Cabinets for Ten Apartments
Post-Bid
$29,000 est. value
Turners Falls, MA

Last Updated 06/01/2022 11:18 PM
Project Title

Install Wall Protection Panels Throughout First Floor Corridor

Physical Address View project details and contacts
City, State (County) New Bedford, MA 02746   (Bristol County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $107,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install wall protection panels throughout first floor corridor. Remove and install new acoustical ceiling throughout first floor corridor.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents