Similar Projects
Laguna Boulevard Right Turn Lane to West Stockton Boulevard - WTR058 - City of Elk Grove
Infrastructure
Conception
Elk Grove, CA 95758

Laguna Creek Trail - Crossing at State Route 99 - WTL016 - City of Elk Grove
Infrastructure
Conception
$6,320,000 est. value
Elk Grove, CA 95624

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Laguna Creek and Whitehouse Creek Multi-Functional Corridor Project - WDR018 - City of Elk Grove
Infrastructure
Design
$3,164,000 est. value
Elk Grove, CA

Roseville Road RR Crossing - Street Light Installation
Alteration
Bidding
$440,000 est. value
CA

Roadway Excavation, Place Cl2 Ab, HMA and RHMA, and Modify Ramp Meters
Infrastructure
Bidding
$28,000,000 est. value
CA

Type B Street Light Poles
Infrastructure
Post-Bid
Sacramento, CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Upper Multi-Purpose Area Repairs and Improvements Kiefer Landfill
Infrastructure
Results
$225,000 est. value
Sloughhouse, CA 95683

Folsom Boulevard Complete Streets Phase 1
Infrastructure
Results
$5,400,000 est. value
Sacramento, CA

Willard Parkway Landscaping Epoch Drive To Kammerer Road - WFL011 - City Of Elk Grove
Alteration
Conception
$875,400 est. value
Elk Grove, CA 95757

Construct Two Auxiliary Lanes and Upgrade Four Ramp Metering Systems
Infrastructure, Alteration
Design
$17,583,000 est. value
Elk Grove, CA 95758

Place HMA, Furnish Polyester Concrete Overlay, and Concrete Barrier
Infrastructure
Bidding
$4,490,000 est. value
Sacramento, CA

Cold Plane AC Pavement, Place HMA and Replace Concrete Slabs
Infrastructure, Alteration
Post-Bid
$4,860,000 est. value
CA

Hot Mix Asphalt (HMA) Concrete Grinder Dig Out Repair and Replacement Paving
Infrastructure
Results
CA

Reported 07/12/2022 11:30 AM
Project Title

Fair Oaks Boulevard at Kenneth Intersection Improvements - P487844 - Sacramento County

Physical Address View project details and contacts
City, State (County) Sacramento, CA 95811   (Sacramento County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Paving/Reconstruction, Roadway Lighting
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2023
Bids Due View project details and contacts
Estimated Value $546,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and outdoor lighting for a road / highway in Sacramento, California. Conceptual plans call for site work for a road / highway; and for outdoor lighting for a road / highway. This project will signalize the intersection at Fair Oaks Boulevard and Kenneth Avenue. As of July 11, 2022, this project is currently in the FY 2022-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents