Similar Projects
Storm Water Cover Replacement Project
Post-Bid
Snowmass, CO 81615

Yampa River Channel Restoration & Access Design
Post-Bid
Less than $50,000 est. value
Steamboat Springs, CO 80477

Pmaa, Wray SFU - Pond Liners
Results
Less than $361,669 est. value
Wray, CO 80758

Fountain Creek Channel Stabilization at Riverside Project
Results
$2,000,000 to $3,000,000 est. value
Colorado Springs, CO

6th Avenue Culvert Replacement
Post-Bid
Monte Vista, CO

Landfill Cell Project
Results
Less than $368,733 est. value
Grand Junction, CO 81503

Bear Creek Trail Reconstruction
Post-Bid
$100,000 to $250,000 est. value
Delta, CO 81416

Culvert Replacement Various Locations
Results
$1,000,000 to $5,000,000 est. value

Bridge Abutment Foundation Repair
Post-Bid
Lakewood, CO 80228

Stokes Gulch Culvert Replacement
Results
Less than $268,126 est. value
Steamboat Springs, CO 80487

EWP Phase 1D: County Road 442
Post-Bid
CO

3rd Street Improvements
Results
Silverthorne, CO

2" Flexible Conduit
Post-Bid
Fort Collins, CO 80521

Chatfield Corners Underdrain Overflow Pipeline
Results
Less than $44,890 est. value
Gypsum, CO 81637

Maintenance of Sediment Pond, Nottingham Road
Post-Bid
Avon, CO

Last Updated 10/14/2021 12:27 PM
Project Title

Jackson Gulch Outlet Rehabilitation Segment #3 Project

Physical Address View project details and contacts
City, State (County) Mancos, CO   (Montezuma County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this projects to reshape and line approximately 222 linear feet of existing earthen canal. The trapezoidal canal is approximately 30 feet wide at the top, 12 feet wide at the bottom and 6 feet deep. The work will consist of canal reshaping, a geomembrane liner of 30 mil PVC sandwiched between two layers of 10 oz. geotextile fabric and a 4-inch thick protective concrete cover. Bacon-Davis wage rates and reporting requirements are required on this project.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents