Similar Projects
Saratoga Springs Lake Mountain Zone 2 South Pond and Losee Canyon Debris
Bidding
Saratoga Springs, UT

UDOT Culvert Cleaning and Video Contract
Term Contract
Post-Bid

500 East 600 South Design
Post-Bid
Salem, UT 84653

Pony Express Trench Repair
Results
Less than $1,000,000 est. value
Eagle Mountain, UT 84005

Utah County Various NRCS Emergency Watershed Protection (EWP) Projects
Results
Provo, UT 84606

The East Bay Golf Course Pond Banks Renewal Project
Post-Bid
Provo, UT 84606

Filters and Diversions Project
Results
Less than $1,002,915 est. value
Pleasant Grove, UT 84062

Knolls Fire Erosion Mitigation Project Phase 2
Post-Bid
Less than $901,255 est. value
Saratoga Springs, UT 84045

Sixth Water Flow Control Structure Modification
Results
Orem, UT 84097

Traverse Mountain Emergency Watershed Protection
Post-Bid
Lehi, UT 84043

Spanish Fork MS4
Results
Spanish Fork, UT

Drain Cleaning and Related Services
Term Contract
Post-Bid

Spanish Fork Parkway Phase 2 Grading
Term Contract
Results
Spanish Fork, UT 84660

Lower School House Springs - Phase II
Post-Bid
Lehi, UT

Crab Creek Restoration
Results
$310,000 to $330,000 est. value
Provo, UT 84606

Last Updated 07/17/2020 06:23 AM
Project Title

Provo/Orem MS4

Physical Address View project details and contacts
City, State (County) Orem, UT 84058   (Utah County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of construction of a new wash rack and material storage bins. The demolition of the water retention/detention facilities and desalination evaporative ponds, and the existing wash rack. Installation of fixed equipment (provided as part of the work unless otherwise noted), utility connections and fees, excavation, grading and other site improvements are required as part of the work.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents