Similar Projects
Indoor Air Quality Improvements at East Hartford Middle School
Renovation
Sub-Bidding
$600,000 CJ est. value
East Hartford, CT 06108

Boiler Service and Maintenance
Term Contract
Sub-Bidding
East Hartford, CT 06118

HVAC and Boiler Systems Preventative Maintenance Services
Alteration
Post-Bid
East Hartford, Hartford, Middletown, New Britain, CT 06114

On-Call HVAC Services
Term Contract
Post-Bid
Berlin, CT

Replacement of the Daiken VRF System at Illing Middle School
Results
Manchester, CT 06040

Partial Roof Replacement and Installation of New Roof-Top Units
Alteration
Results
Hartford, CT

Hartford Vestibule Update
Renovation
Sub-Bidding
$180,000 CJ est. value
Hartford, CT 06103

Sage Park Middle School HVAC Renovation Project Phase 2
Alteration
Post-Bid
Windsor, CT 06095

HVAC Services
Alteration
Results
Bloomfield, CT

HVAC Work for Slade Middle School
Renovation
Sub-Bidding
$800,000 CJ est. value
New Britain, CT 06052

55 Farmington Avenue HVAC Upgrades
Alteration
Post-Bid
$446,975 to $494,025 est. value
Hartford, CT 06105

Milo Peck Child Care School Energy and Efficiency HVAC Upgrades
Alteration
Results
Windsor, CT 06095

Gideon Welles School Boiler Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Glastonbury, CT 06033

HVAC System Replacement
Alteration
Post-Bid
East Granby, CT 06026

HVAC Repairs, Maintenance and On Call Services
Alteration
Results
Waterford, CT

Last Updated 04/03/2023 03:15 PM
Project Title

HVAC System Upgrades at Chippens and Hubbell Schools - City of Bristol

Physical Address View project details and contacts
City, State (County) Bristol, CT 06010   (Hartford County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected June 2023 , Request For Proposals, Construction documents
Bids Due View project details and contacts
Estimated Value $8,500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 3, 2023, an engineer has been selected and this project is in the final planning phase. Although a firm timeline for construction has not been determined, it is anticipated bidding will commence in May 2023, with construction following. *The closed solicitation has been included below for reference: Engineering Services Relative to HVAC System Upgrades at Chippens Hill Middle School and Ellen P. Hubbell Elementary School The City of Bristol (the City) and its Board of Education are seeking a qualified firm to prepare construction documents toward the installation of HVAC system upgrades at Chippens Hill Middle School, located at 551 Peacedale Street, and Ellen P. Hubbell Elementary School, located at 90 West Washington Street. Proposal submission documents are available from this website via the document link noted below. Funding for these projects is made available via American Rescue Plan Act/Elementary and secondary School Emergency Relief (ARP/ESSER) funds. All work shall assume incorporation of regulations and considerations associated with the use of said funds. The City reserves the right to waive any informalities in any submission, to reject any and/or all submissions, and to accept the proposal that in its judgment is in its best interest. Interested firms are required to submit one original copy via digital media of the proposal to the Purchasing Department no later than the date and time noted above. Submissions may be made via email, shared file service, or USB drive; the City does not assume responsibility for failure of submissions to be received by the City by the date and time noted above. The awarded firm will take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, color, religion, gender, or national origin. The method of contractor selection has not been determined at this time. The City anticipates a total budget of $6.9 million for work at Chippens Hill Middle School ("CHMS"), and a total budget of $1.6 million for work at Ellen P. Hubbell Elementary School (EPH). These budget values are inclusive of all hard and soft costs. All work shall assume incorporation of regulations and considerations associated with the use of said funds.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents