Similar Projects
Maintenance and Repairs of Overhead Roll-Up Doors
Bidding
Orlando, FL

Z--Window Replacement
Post-Bid
Orlando, FL 32827

Overhead Door and Dock Leveler Maintenance and Repairs
Term Contract
Post-Bid
Orlando, FL

Preventative Maintenance and Service for Amway Center Overhead Doors and Dock Levelers and Camping World Stadium Overhead Doors
Term Contract
Results
Orlando, FL 32805

J--PM for Automatic Doors
Results
Orlando, FL 32827

Blackout Shades
Post-Bid
FL

Sheriffs Central Operations Security Enhancement
Results
$270,000 est. value
Orlando, FL 32801

Furnish and Install Radius Glass
Post-Bid
Orlando, FL 32827

Z--Re-Issue Window Replacement
Results
Orlando, FL 32827

5520--Equip; Provide and Install Changing Room Doors
Post-Bid
Orlando, FL 32827

Door Inspection, Preventative Maintenance Repair and Testing at the Orange County Convention Center
Term Contract
Results
Orlando, FL 32819

5520--Changing Room Doors
Post-Bid
Orlando, FL 32827

Hurston Complex, ADA Corrections
Results
$2,000,000 est. value
Orlando, FL

Installation of Automatic Door Openers and Push Buttons to Enter/Exit at NAWCTSD Complex
Post-Bid
$25,000 to $100,000 est. value
Orlando, FL 32826

Automatic Door Repair, Maintenance and Upgrade Services Orlando International Airport
Term Contract
Results
$264,750 est. value
Orlando, FL 32827

Reported 10/01/2019 12:00 AM
Project Title

Window Film Installation Airside 4 80’s Wing

Physical Address View project details and contacts
City, State (County) Orlando, FL 32827   (Orange County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The initial assessment will take place once a Purchase Order is awarded to include inspection of each window. Authority’s Authorized Representative (AAR) and contractor will inspect any abrasions, scratches, or imperfections prior to film installation. All windows will be thoroughly cleaned with soluble solution using stainless steel blades removing any debris attached to glass. The glass will be prepared and cleaned using micro fiber cloths. 3M Prestige 20 window film will be installed on the inside of each window, utilizing the pressure sensitive adhesive to attach the film to the glass. Once installation is complete, each window will again be cleaned and inspected for any imperfections.
Details
Division 08 - Openings, Doors and Frames, Windows.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents