Similar Projects
New Water Treatment System
Term Contract, Alteration
Design
$25,000 to $100,000 est. value
Waldport, OR

Public Services Building HVAC Upgrade
Alteration
Bidding
$450,000 to $500,000 est. value
Salem, OR 97310

Wood Stove Exchange
Alteration
Bidding
Hillsboro, OR

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC Filters, Installation and Coil Cleaning Services
Alteration
Results
$245,000 est. value
Hillsboro, OR

Pioneer Hall AC Replacement
Alteration
Results
$251,293 est. value
Bend, OR 97703

Marion County Jail HVAC Upgrade
Alteration
Bidding
$200,000 est. value
Salem, OR 97317

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Linn-Benton Community College Main Campus Takena Remodel Project
Alteration
Results
Albany, OR 97321

Residential HVAC Contractors
Term Contract
Post-Bid
OR

Design-Build for Mechanical or HVAC
Alteration
Results
Springfield, OR 97477

Medford School District MSDEC Annex HVAC Upgrades
Renovation
Post-Bid
Medford, OR 97501

On Demand HVAC Repair Services
Alteration
Results
OR

Lake Oswego Library HVAC and Controls Upgrade
Alteration
Post-Bid
$140,000 to $180,000 est. value
Lake Oswego, OR 97034

Last Updated 05/11/2022 12:58 AM
Project Title

Harrisburg Elementary and Middle School HVAC Replacement and Improvements

Physical Address View project details and contacts
City, State (County) Harrisburg, OR   (Linn County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Elementary school, removal and replacement of (14) existing gas furnaces in Building 1 classrooms: 1-14. Install air purification units in these (14) classrooms. 2. Add rooftop condensing units for direct expansion cooling to the (14) Building 1 Elementary school classrooms, where the new furnaces are to be installed. Install (1) mini split cooling unit for the Elementary school, Building 1 Data/IT equipment server room. Install (2) evaporator coils and (2) rooftop condensing units for the addition of cooling to (2) existing newer Daikin gas furnaces: for Building 1 Elementary school classrooms 15 & 16 (units FE-15 & 16.) Install (2) evaporator coils and (2) rooftop condensing units for the addition of cooling to (2) existing newer Daikin gas furnaces: for Elementary school Building 1 Multi-purpose room/gym (units EF-17 & 18.) Install air purification units for the rooms that are supplied by units: FE-15 & 16 and EF-17 & 18. 3. Install (6) Wall mount, cooling only, Mini Splits and (6) outdoor condensing units at Harrisburg Middle School Building 3 for classrooms 19-22. BID # 1 Scope of work inclusions- Furnish and install (14) Trane model S8X2B060M4PSCA natural gas furnace, multi-position, 80% AFUE, 2-stage, direct drive 2-speed blower, aluminized steel heat exchanger, 120V, 1 PH. Furnish and install (14) Global Plasma Solutions (GPS) model FC24-AC self-cleaning, 24V, bi-polar ionization units for classroom air purification. Furnish and install (14) Honeywell Vision Pro 8000, 7-day programmable, 3H/2C, 24V thermostat with Redlink. Furnish and install 4" b-vent flue piping, fittings, storm collar and terminations for new furnace installations. Furnish and install gas piping, fittings and components from existing regulators to new furnaces. Remove and dispose of (14) existing gas furnaces, flues and gas piping to the gas regulators on roof in classroom closets. Furnish and install all duct modifications to connect new furnaces to existing ductwork, including new filter racks with MERV 13, 2" pleated filters. Disconnect electrical connections to existing furnaces. Furnish and install proper breakers and fused disconnects for new furnaces. Reconnect line voltage wiring to new furnaces per code. Electrical services provided by the contractor. Provide insulation contractor to insulate OSA duct per code. Provide air balancing contractor to balance classroom supply, return and outside air. Provide TAB report per code. Perform startup/commissioning of furnaces per OEM Specs. All required building permits. BID # 2 Scope of work inclusions- Furnish and install (4) Global Plasma Solutions (GPS) model FC24-AC self-cleaning, 24V, bipolar ionization units for air purification in classrooms 15, 16 and MPR/gym. (Units FE-15 & 16 and EF-17 & 18) Furnish and install (1) Daikin model FTX12AXVJU 1-ton, cooling only, wall-mount, mini split, fan/coil unit with remote controller, 208/230V, 1 PH. Furnish and install (1) Daikin model RK12AXVJU 1-ton, cooling only, mini split, condensing unit, 208/230V, 1 PH. Furnish and install (1) mini split roof curb with cap. Provide roofing contractor to dry in roof curb for mini split installation. Roofing services provided by the contractor. Furnish and install line set, communication wiring, condensate pump and piping for mini split installation. Provide electrical contractor to install electrical circuit, fused disconnect and wiring for mini split installation. Electrical services provided by the contractor. Furnish and install (14) 36" X 36" X 18" condensing unit roof curbs with caps. Furnish and install (14) 12" X 12" X 18" roof pitch pans for refrigerant piping roof penetrations. Provide structural engineering required to set additional equipment on roof. Provide reach forklift for getting roof curbs and equipment to roof locations. Provide roofing contractor to dry in roof curbs and pitch pans. Furnish and install line sets, control wiring, condensate pumps and piping required for DX cooling installations. Provide electrical contractor to install (14) new electrical circuits, breakers, fused disconnects and wiring for DX cooling installations. Provide electrical engineering required for the addition of (14) condensing units. Furnish and install (2) Daikin model DX13SA0361 3-ton, single stage, 13 SEER, R-410A, 1 Ph, 208230V condensing units. Furnish and install (2) Daikin model CHPF3636B6 3-ton, aluminum, horizontal cased "A" coil. Furnish and install (2) Daikin model DX13SA0603 5-ton, single stage, 13 SEER, R-410A, 1 Ph, 208/230V condensing units. Furnish and install (2) Daikin model CHPF4860D6 5-ton, aluminum, horizontal cased "A" coil. Remove ductwork necessary to install horizontal cased cooling coils. Detail, fabricate and install new ductwork necessary for coil installation. Furnish and install (3) Honeywell Vision Pro 8000 thermostats. Furnish and install (2) 36" X 36" X 18" roof curbs for the 3-ton condensing units. Furnish and install (2) 48" X 48" X 18" roof curbs for the 5-ton condensing units. Furnish crane for lifting condensing units and curbs to the roof locations. Furnish roofers to dry in the new curbs in (4) locations. Furnish and install line sets, control wiring and condensate piping for new cooling installations. Furnish electrician to install (4) new circuits to condensing units with breakers and fused disconnects per code. Perform refrigerant circuit pressure testing, vacuum and charging per OEM specifications. Perform startup/commissioning on all equipment per OEM specifications. All required building permits. BID # 3 Scope of work inclusions- Furnish and install (2) Daikin model FTXS24LVJU 2-ton, R-410A, cooling only, wall-mounted fan/coil units, 208/230V, 1 Ph. Furnish and install (2) Daikin model RXS24LVJU 2-ton, R-410A, cooling only, outdoor condensing units, 208/230V, 1 Ph. Furnish and install (4) Daikin model FTXS36LVJU 3-ton, R-410A, cooling only, wall-mounted fan/coil units, 208/230V, 1 Ph. Furnish and install (4) Daikin model RKS36LVJU 3-ton, R-410A, cooling only, outdoor condensing units, 208/230V, 1 Ph. Furnish and install (6) roof curbs with caps and pitch pans for the installation of the outdoor condensing units. Furnish and install (6) Daikin low ambient wind baffles for outdoor condensing units. Furnish and install (6) Daikin One+ smart thermostats for mini split control. Provide electrical contractor to install (6) new circuits, fused disconnects and wiring required for the mini split installations. Furnish and install (6) line sets, communication wiring, condensate pumps and piping required for mini split installation. Install pads for mounting the condensers in the courtyard on the North side of Building 3. Perform refrigerant circuit pressure testing, vacuum and charging per OEM specifications. Perform startup/commissioning on all equipment per OEM specifications. All required building permits.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents