Similar Projects
HVAC Maintenance Services
Term Contract
Design
Middletown, Newark, DE - Easton, Prince Frederick, MD

HVAC and Related Systems Inspections and Maintenance
Alteration
Bidding
Wilmington, DE

South Bridge Exhaust Fan Installation
Alteration
Bidding
Wilmington, DE 19801

J059--Direct Digital Control Services
Post-Bid
Wilmington, DE 19807

Evans Hall Air Handler Unit Replacement
Post-Bid
Newark, DE 19716

DEANG Heatpump Inspections
Results
New Castle, DE

2902 Boiler Replacement
Results
Minquadale, DE 19720

District-Wide Bottle Filling Station Replacement
Alteration
Bidding
New Castle, DE 19720

J059--Direct Digital Control Services Wilmington VAMC
Post-Bid
Wilmington, DE

Chiller Replacement at Ferris School
Results
Wilmington, DE 19805

J045--Hood and Duct Services
Post-Bid
Wilmington, DE 19805

Carvel State Office Building - Cooling Tower & Boiler Replacement
Results
Less than $2,385,000 est. value
Wilmington, DE 19801

Middletown High School -Roof Replacement and HVAC Renovation
- 140,000 SF
Post-Bid
Middletown, DE 19709

DTCC Stanton Campus A-Wing HVAC
Results
Newark, DE 19713

HVAC Replacement
Alteration
Post-Bid
Wilmington, DE 19801

Last Updated 04/14/2022 04:21 PM
Project Title

Brader Elementary School - ESSER HVAC System Renovations

Physical Address View project details and contacts
City, State (County) Newark, DE 19702   (New Castle County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the project involves the removal and replacement of existing interior lighting fixtures, controls, and wiring as noted on drawings, remove electrical services to all HVAC equipment to be removed and refeed new HVAC equipment with new services, remove and replace existing above ceiling piping and ductwork as noted in drawings, remove and replace existing HVAC rooftop equipment as noted on drawings, modify existing fire protection as noted on drawings, remove existing exterior wall unit ventilators and infill exterior wall as noted on drawings, remove and replace suspended ceiling systems as noted on drawings, remove and replace existing curb mounted skylights, and remove and replace existing Ballasted EPDM roof, insulation, roof drains, flashings, and perimeters metals, etc. with a new Fully Adhered EPDM roof system.

Details

Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Fabrications.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents