Similar Projects
Crabtree Force Main/Park Hill Pump Station
Renovation, Infrastructure
Bidding
$550,000 est. value
Conway, SC 29526

Parris Bridge Road Booster Pump Station
Renovation
Bidding
$1,000,000 est. value
Spartanburg, SC

Lake Rabon Raw Water Pump Station Surge Tank Improvements
Post-Bid
$600,000 to $700,000 est. value
Laurens, SC

Plant Control Pump Station - Pump Base Improvements
New Construction
Post-Bid
Charleston, SC

Pump Station #153 Control Panel Replacement
Results
Andrews, SC 29510

McRae Road Pump Station Upgrade
Results
Camden, SC 29020

Calvin Hall Pump Station
Renovation
Bidding
$320,000 est. value
Indian Land, SC 29707

Buchanan Bridge Pump Station and Force Main
Renovation
Post-Bid
Less than $400,000 est. value
Chesterfield, SC

Sanitary Sewer System Improvements at Rices Creek Lift Station
Results
Liberty, SC 29657

Clemson Pump Station Trash Rack Rake System
New Construction
Bidding
$1,000,000 to $5,000,000 est. value
Clemson, SC

O Dell Street Lift Station and Sewer Line
Infrastructure
Post-Bid
Liberty, SC 29657

Regional Pump Station Upgrades
Results
Less than $4,279,100 est. value
North Charleston, SC 29419

Clemson Research Park and Boscobel Pump Station Improvements
Renovation
Bidding
$400,000 est. value
Anderson, SC

Sanitary Sewer Improvements Corley Tract Pump Station Modifications
Renovation
Post-Bid
$200,000 est. value
Lexington, SC

Shore Road Pump Station Improvements New Lime Storage and Feed System
Renovation
Results
$150,000 est. value
Lexington, SC

Last Updated 05/03/2022 11:38 AM
Project Title

Treatment Plant Upgrade

Physical Address View project details and contacts
City, State (County) Lyman, SC 29365   (Spartanburg County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install new 85-foot diameter clarifier. Replace existing sludge pumps with new pumps in new dry pit pump station. install new pumps in an existing wetwell to pump decant from the sludge thickener and process water from the existing belt press. replace existing 8-inch RAS line with 14-inch. improvements and modifications to two existing 85-foot diameter clarifiers.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents