Similar Projects
Palasota Drive - Phase 2 Reconstruction
Infrastructure
Bidding
$2,049,180 est. value
Bryan, TX 77803

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Horticulture Forest Science Replace Hardware and ADA Upgrades
Infrastructure
Post-Bid
College Station, TX 77840

Southside Safety Improvements Projects
Results
College Station, TX 77840

Concrete Sidewalks and Bike Lanes
Results
Less than $1,268,455 est. value
TX

Upgrade Signals
Results
Less than $1,276,222 est. value
TX

Blanket Order for Pedestrian Crosswalk System
Term Contract
Results
$18,590 est. value
College Station, TX 77845

Fabrication and Installation of Sidewalk
Results
College Station, TX 77845

Lick Creek Hike and Bike Trail Head and Parking Lot
Results
Less than $329,427 est. value
College Station, TX

Harvey Mitchell Parkway (FM2818) Dartmouth Traffic Signal
Results
$410,100 est. value
College Station, TX 77840

Pedestrian Traffic Rail
Results
Less than $60,650 est. value
College Station, TX

Castle Rock Sidewalk Project
Results
$120,000 est. value
College Station, TX 77844

Eastgate Neighborhood Sidewalk and Southwood Sidewalk Improvements Project
Results
$450,000 est. value
College Station, TX 77844

Reconstruction of Greens Prairie Railroad Crossing Median
Infrastructure
Results
College Station, TX

SH0006 - Traffic Control Services
Infrastructure
Results
$2,062,870 est. value
TX

Last Updated 10/07/2021 04:25 PM
Project Title

E 29Th St. Traffic Signal Improvements E29th St/Broadmoor Dr and E 29Th St/Carter Creek Pkwy

Physical Address View project details and contacts
City, State (County) Bryan, TX 77802   (Brazos County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $645,172
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City anticipates the scope of work for the Project to consist of the following responsibilities and the following items: 1. Removal of existing traffic signals 2. Installation of new traffic signals 3. Installation of traffic striping 4. Construction of sidewalk and roadway pavement 5. Construction of storm drainage utilities 6. All other appurtenances necessary to complete the Project.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents