Similar Projects
Last Updated | 06/22/2023 04:35 AM |
Project Title | Roof Membrane Replacement at Fresno-Clovis Regional Wastewater Reclamation Facility (RWRF) Administration Building |
Physical Address | View project details and contacts |
City, State (County) | Fresno, CA 93706 (Fresno County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $353,233 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The scope of work includes, but is not limited to; removal and replacement of existing roof membrane at the RWRF Administration Building. A 100 percent Payment Bond and 100 percent Performance Bond for all public works contracts must be filed with the Contract Documents and approved by the City before the Contractor enters upon performance of the Work. All Proposals Must Be Made on the Bid Proposal Form Provided by the Purchasing Manager. A Bid Deposit, Which Can Be Provided Separately, in the Amount of Ten Percent (10%) of the Total Net Bid Amount (or, in Bids With Add Alternates, the Highest Possible Combination of the Base Bid Plus Add Alternates) in the Form of a Certified or Cashier's Check, an Irrevocable Letter of Credit, or a Certificate of Deposit or a Bidder's Bond Executed by a Corporate Surety, Admitted by the California Insurance Commissioner to Do Business in California, Payable and Acceptable to the City of Fresno; or the Bidder Shall Have Registered With the Purchasing Manager of the City an Annual Bid Bond Sufficient to Provide Coverage in Such Amount. The City reserves the right to reject any and all bids. License Requirements C-39 Liquidated Damages $100.00 Per Each Calendar Day Project Duration 60 Working Days from Notice to Proceed Date Online Q&A No The Specifications describing this project have been carefully prepared. Any questions or concerns relating to these Specifications shall be directed in writing to the designated Procurement Specialist of the Purchasing Division (see cover page) and shall be sent by facsimile to the RightFax number on the cover page. A Bid Question form for this purpose has been included as page ix. The Construction Allocation for this project is $270,000.00. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |