Similar Projects
Maxcy College Renovation - University of South Carolina
Renovation
Conception
$3,700,000 to $4,200,000 est. value
Columbia, SC

Volleyball Facility Construction - University of South Carolina
New Construction, Infrastructure
Conception
Less than $7,000,000 est. value
Columbia, SC 29201

USC Business and Education Building Renovation
Renovation
Design
$3,000,000 to $3,500,000 est. value
Aiken, SC 29801

KW Green Student Center Renovation
Renovation - 32,500 SF
Design
Orangeburg, SC 29115

Building 118 Renovation
Renovation
Bidding
$1,850,000 CJ est. value
Greenville, SC 29607

NETC- Demolition of Buildings 400, 600, and 700
Demolition, Infrastructure
Bidding
$120,000 CJ est. value
Cheraw, SC 29520

York Technical College Worker Storage Building Construction
Renovation - 826 SF
Post-Bid
$230,000 to $280,000 est. value
Chester, SC 29706

CU-ICAR Flex Lab One Project
Renovation, Infrastructure - 80,000 SF
Post-Bid
$6,500,000 CJ est. value
Greenville, SC 29607

Lewis Lab and Annex Renovations
Renovation
Results
$800,000 to $850,000 est. value
Orangeburg, SC 29117

Building 103 Bookstore Expansion
Renovation - 6,719 SF
Results
$450,000 to $500,000 est. value
Greenville, SC 29607

College of Charleston Mcalister Hall 2021 Renovation
Renovation - 152,144 SF
Construction
$51,000,000 CJ est. value
Charleston, SC 29424

Tri-County Technical College SSC IT Suite Optimization
Renovation
Construction
$100,325 CJ est. value
Pendleton, SC 29670

University of South Carolina Health Sciences Campus
New Construction, Infrastructure - 292,000 SF
Pending Verification
$300,000,000 CJ est. value
Columbia, SC 29209

University of South Carolina Health Sciences Campus
New Construction, Infrastructure - 292,000 SF
Pending Verification
$300,000,000 CJ est. value
Columbia, SC 29209

Redevelopment of Winthrop Tennis Courts - City of Rock Hill
Infrastructure
Conception
$1,850,000 CJ est. value
Rock Hill, SC 29730

Last Updated 07/19/2023 04:21 PM
Project Title

RFQ - Design Build Johnstone Hall / Core Campus Demolition

Physical Address View project details and contacts
City, State (County) Clemson, SC 29631   (Pickens County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Design-Build Firm to Subcontract, Competitive Bids
Project Status Bidding, Construction start expected July 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $14,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of 7/19/2023, owner has determined a shortlist of Design Builders for interview. Demolish Johnstone Hall, Harcomb Dining Hall, Student Union, and Facilities Yard. Fill, grade, and finish the sites. Project Location: CU Main Campus Construction Cost Range: $10,000,000 to $14,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Deadline for written questions 5/17/23 The Johnstone Hall and Facilities Maintenance areas on Clemson Universitys campus have served the University for generations and are now slated to be demolished. Due to the scale of this demolition project and proximity to campus life, prior to commencement of work in these project areas, the University has requested Land Planning Associates, Inc. update the project narrative to communicate design intent, utility relocation/termination along with other requirements that pertain to the demolition project. Details examined included timing, safety, impact to campus daily operations, environmental impacts, salvage of materials, demolition and re-routing of utilities, postdemolition/interim site use, budget, and schedule. The potential impact to daily operations of students, faculty, and staff of the University occupying the surrounding areas of the project sites is high, making delicate consideration of all relevant parties critical to minimizing disturbance to these groups during this project. With the key information gathered from relevant departments and groups as a guiding principle, conceptual plans for demolition, interim site/grading, and utility demolition/re-routing have been developed for the Johnstone Demolition and Facilities Demolition sites. It should be noted that although this narrative covers both scopes of work, Johnstone Demolition and Facilities Demolition will most likely be carried out in two separate timelines.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents