Similar Projects
Davis Creek Elementary School Construction
New Construction
Conception
Huntington, WV

New Central Elementary School
New Construction
Conception
$18,000,000 est. value
Charles Town, WV

Ranson Elementary Construction
New Construction
Design
Ranson, WV

New Primary School
New Construction
Design
$9,600,000 est. value
Princeton, WV

Marlinton Elementary Boiler and Roof Replacement
Renovation
Bidding
$400,000 CJ est. value
Marlinton, WV 24954

Milton Elementary School
New Construction, Infrastructure - 54,508 SF
Bidding
$6,400,000 CJ est. value
Milton, WV 25541

Ruthlawn Elementary School Renovations
Addition - 2,877 SF
Post-Bid
South Charleston, WV 25309

New Ranson and Shepherdstown Elementary Schools
New Construction, Infrastructure - 136,000 SF
Post-Bid
$20,000,000 CJ est. value
Ranson, WV 25438

Toilet Renovations and Additions to Wayne County Schools
Renovation, Addition - 4,873 SF
Results
Wayne, WV 25570

Additions and Renovations to Richwood Middle School, Richwood High School, and Cherry River Elementary School
Renovation, Addition - 108,471 SF
Results
Richwood, WV 26261

Safer School Entrances - 2022 Bond - Berkeley County Schools
Renovation
Pending Verification
$4,425,000 CJ est. value
Martinsburg, WV 25401

Security, Fire Alarms, Cameras and Intercoms - 2022 Bond - Berkeley County Schools
Renovation
Pending Verification
$4,484,150 CJ est. value
Martinsburg, WV 25401

Duval & Midway PreK-8 School Project
Renovation
Conception
$24,746,460 est. value
Hamlin, WV

Cottageville Elementary School Renovations
Renovation
Post-Bid
Cottageville, WV 25239

Gilmore Elementary School Wastewater Treatment Plant Replacement
Renovation
Results
Sandyville, WV 25275

Last Updated 03/22/2023 12:11 PM
Project Title

Renovation of Hite Saunders Elementary School

Physical Address View project details and contacts
City, State (County) Huntington, WV 25701   (Cabell County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Copy Center - 03/14/22
Owner View project details and contacts
Architect View project details and contacts
Description

If bids are submitted by postal or other delivery services, they must arrive prior to the time stated above and be enclosed in an outer envelope Bidders will be required to provide Bid security in the form of a Bid Bond in the amount of not less than 5% of the total amount bid, including all add alternates. The bond shall be on the form bound in the Project Manual. A Contract Performance Bond and Payment Bond each equal to one hundred percent of the Contract Price will be required for the successful Contractor. Other bidding requirements are described in the Project Manual The school will be closed for summer break between June 1 and August 10, 2022. Outside of that window, work will not be allowed to be performed until after 3:00 pm on school days. Bidder will be required to enter the number of days needed to complete the Work (Substantial Completion) on the Bid Form. As actual damages for delay in completion of the Work are impossible to determine, the successful Bidder (Contractor) and the Bidder's Surety shall be liable for and shall pay to the Owner an amount calculated per the Supplementary Conditions of the Contract, not as a penalty, but as fixed, agreed, and liquidated damages for each calendar day of delay until the Contract Work is Substantially Complete as defined in the General and Supplementary Conditions of the Contract for Construction. The Owner reserves the right to accept or reject any or all bids, to waive informalities, and to re-advertise

Details

Elementary School, 22,250 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents