Similar Projects
Country Club Expansion
Renovation
Conception
Glenview, IL 60025

Bally's Casino / Chicago
LEED Certification, New Construction, Infrastructure
Design
$1,700,000,000 CJ est. value
Chicago, IL 60654

Water Main Replacement
Design
Elmwood Park, IL

Grasslands Grading Improvements
Post-Bid
Orland Park, IL

Site Paving
Post-Bid
Elgin, IL 60120

Berwyn Depot District Utility Improvements
Results
Less than $11,765,090 est. value
Berwyn, IL

Terminal Area Fire Main Relocation - Lower Level Utility and Pavement Reconstruction
Results
Chicago, IL

Woodfield Village Green Demolition & Shell Package
Renovation, Demolition - 101,267 SF
Construction
Schaumburg, IL 60173

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

East Eighth Street Reconstruction
Post-Bid
Hinsdale, IL

Sidewalk, Curb
Results
Hanover Park, IL

County Line Road: I-294 Ramp to North Avenue
Post-Bid
IL

2021 Crack Routing and Sealing
Results
Hanover Park, IL

2021 Sidewalk, Curb and Gutter Program
Post-Bid
Niles, IL

Last Updated 08/18/2022 08:03 AM
Project Title

2022 Water Main Improvements

Physical Address View project details and contacts
City, State (County) Maywood, IL 60153   (Cook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $979,972 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

the President and Board of Trustees of the Village of Maywood, Cook County, Illinois, that sealed bid proposals will be received for the following improvement: 2022 WATER MAIN IMPROVEMENTS This project includes water main improvements located within the Northwest corner of the Village of Maywood. The work to be performed will include the installation of approximately 1,450 feet of 8" DIP water main and appurtenances; connection of water mains and installation of water services; removal and replacement of certain curb and gutter, sidewalks, and driveway aprons; replacement of certain storm sewer laterals; restoration of disturbed pavement; landscaping restoration of disturbed sections of the parkways, and other related work. The Engineer has been authorized to refuse to issue plans, specifications, and proposals to any person, firm, or corporation that he considers to be unqualified. Proposals must be submitted on the forms provided. All bidders wishing to obtain bidding documents must be approved by the Village prior to obtaining bidding documents. All bidders must provide proof that they are prequalified with the Illinois Department of Transportation to perform at least 50% of the value of the work before being issued bidding documents. No bid shall be withdrawn after the opening of the Proposals without the consent of the President and Board of Trustees of the Village of Maywood for a period forty-five (45) days after the scheduled time of bid opening. The Contractor and Subcontractor shall comply with all regulations issued pursuant to Prevailing Wage Act (820 ILCS 130), and other applicable Federal Laws and regulations pertaining to labor standards. Bidders shall adhere to certain Disadvantaged Business Enterprise (DBE) bid submittal requirements and observe the stated DBE goals as described within the contract documents. The successful bidder for the work will be required to furnish sufficient insurance to the Village of Maywood and the Engineer against all damage claims that might arise due to the negligence of the Contractor and will be required to furnish a Performance Bond and a Labor and Material Payment Bond in the amount of the contract. The Village of Maywood reserves the right in receiving these bids to waive technicalities and reject any or all bids. Should the Contractor not complete the project within the prescribed time limit, liquidated damages shall be assessed at a rate of $1,025.00 per calendar day of overrun.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents