Similar Projects
Last Updated | 08/18/2022 08:03 AM |
Project Title | 2022 Water Main Improvements |
Physical Address | View project details and contacts |
City, State (County) | Maywood, IL 60153 (Cook County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $979,972 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | the President and Board of Trustees of the Village of Maywood, Cook County, Illinois, that sealed bid proposals will be received for the following improvement: 2022 WATER MAIN IMPROVEMENTS This project includes water main improvements located within the Northwest corner of the Village of Maywood. The work to be performed will include the installation of approximately 1,450 feet of 8" DIP water main and appurtenances; connection of water mains and installation of water services; removal and replacement of certain curb and gutter, sidewalks, and driveway aprons; replacement of certain storm sewer laterals; restoration of disturbed pavement; landscaping restoration of disturbed sections of the parkways, and other related work. The Engineer has been authorized to refuse to issue plans, specifications, and proposals to any person, firm, or corporation that he considers to be unqualified. Proposals must be submitted on the forms provided. All bidders wishing to obtain bidding documents must be approved by the Village prior to obtaining bidding documents. All bidders must provide proof that they are prequalified with the Illinois Department of Transportation to perform at least 50% of the value of the work before being issued bidding documents. No bid shall be withdrawn after the opening of the Proposals without the consent of the President and Board of Trustees of the Village of Maywood for a period forty-five (45) days after the scheduled time of bid opening. The Contractor and Subcontractor shall comply with all regulations issued pursuant to Prevailing Wage Act (820 ILCS 130), and other applicable Federal Laws and regulations pertaining to labor standards. Bidders shall adhere to certain Disadvantaged Business Enterprise (DBE) bid submittal requirements and observe the stated DBE goals as described within the contract documents. The successful bidder for the work will be required to furnish sufficient insurance to the Village of Maywood and the Engineer against all damage claims that might arise due to the negligence of the Contractor and will be required to furnish a Performance Bond and a Labor and Material Payment Bond in the amount of the contract. The Village of Maywood reserves the right in receiving these bids to waive technicalities and reject any or all bids. Should the Contractor not complete the project within the prescribed time limit, liquidated damages shall be assessed at a rate of $1,025.00 per calendar day of overrun. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |