Similar Projects
Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Cold plane AC, place HMA (TYPE A) and RHMA-G
Infrastructure
Bidding
$8,600,000 est. value
CA

Cip Bridges, Construct Roadway, Retaining Walls and Modify Electrical
New Construction, Infrastructure
Bidding
$98,000,000 est. value
CA

South Loop Project
Infrastructure
Post-Bid
Santa Clara, CA 95134

A And E On-Call Roadway Construction,District 10
Infrastructure
Post-Bid

SB1 Road Maintenance Projects at Various Locations, FY 2020-2021
Infrastructure
Results
Hollister, CA

Paradise Road Pavement Rehabilitation
Infrastructure
Results
$1,900,000 est. value
Modesto, CA 95351

Construct Roundabout, Curb Ramps, and Lighting Systems
Infrastructure
Bidding
$6,100,000 est. value
CA

Seventh Avenue Arrowhead Drive Road Improvement
Alteration
Post-Bid
Victorville, CA

Citywide Street Reconstruction Phase 2
Infrastructure
Results
$1,600,000 est. value
San Mateo, CA

Roadway Excavation and Place HMA
Infrastructure
Bidding
$114,000 est. value
CA

Colima Road Rehabilitation
Infrastructure
Post-Bid
$6,400,000 est. value
Whittier, CA 90603

PW Transit As-Needed Contract No. 2
Infrastructure, Alteration
Results
$3,000,000 est. value
San Francisco, CA

Manila Highway 255 Shared Use Path
Alteration
Bidding
$888,055 est. value

Last Updated 12/09/2021 11:35 PM
Project Title

2021 Road Repair Project

Physical Address View project details and contacts
City, State (County) Capitola, CA 95010   (Santa Cruz County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $135,380
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes 4” base repairs, reconstruction of existing curb & gutter and tree root removal and related actions. This project is being completed in advance of future resurfacing work scheduled for Spring/Summer of 2022. Construct dig outs and asphalt repairs to six (6) City streets (Bay Ave, Capitola Rd, Diamond St, Fanmar Way, 42nd Ave, and Ruby Ct) with curb and gutter repair on Diamond St.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents