Similar Projects
Clinton Agricultural Associates
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Lebanon, NJ 08833

RFP - Development of Affordable Housing on Block 5, Lots 2 and 3
New Construction, Infrastructure
Bidding
$30,000,000 CJ est. value
Pittstown, NJ 08867

Chestnut Place Resurfacing Project
Infrastructure
Bidding
$500,000 CJ est. value
Lebanon, NJ 08833

Fabrication and/or Installation of Structural Steel & High and Low Pressure Pipe Work
Infrastructure
Post-Bid
$190,000 CJ est. value
Camden, NJ 08104

Roadway Reclamation (FDR) of Bristol Avenue
Infrastructure
Post-Bid
$300,000 CJ est. value
Readington Township, NJ 08822

Maintenance Pump Station Repair Contract Statewide - 2022
New Construction
Results
Less than $5,000,000 est. value

Replacement of Eleven Sluice Gates and Operating Assembly Components along the Delaware and Raritan Canal
Infrastructure
Results
$157,000 CJ est. value
Clinton, NJ 08809

NJ Transit Raritan River Bridge, GC-02
Demolition, New Construction, Infrastructure
Pending Verification
$143,924 CJ est. value
Newark, NJ 07102

New Vocational Building - Hunterdon County Vocational School District
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Clinton Township, NJ 08801

Long Term Stabilization of the Delaware and Raritan Canal's Western Embankment From Station 156+00 to 207+00, Phase I
Infrastructure
Bidding
$150,000 CJ est. value
Stockton, NJ 08559

Nishisakawick Creek Stream Bank Stabilization and Restoration Project
Infrastructure
Post-Bid
$895,139 CJ est. value
Frenchtown, NJ 08825

Rehabilitation of Pumps 4, 5, 7, & 8 at the South Branch Pumping Station
Renovation
Results
$2,779,492 CJ est. value
Clinton Township, NJ 08801

Rosedale and Rosehill Cemetery
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Readington Township, NJ 08889

Convert Existing Basketball Courts to Four Pickleball Courts at Blackwell Park Everitts Road
Infrastructure
Post-Bid
$200,000 CJ est. value
East Amwell Township, NJ 08551

Softball Dugouts and JV Baseball Field Repair at the existing Hunterdon Central Regional High School
Infrastructure
Results
$992,000 CJ est. value
Flemington, NJ 08822

Last Updated 05/06/2023 06:04 AM
Project Title

North Hunterdon Regional High School Pump Station Replacement State Loan

Physical Address View project details and contacts
City, State (County) Clinton, NJ 08809   (Hunterdon County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of demolition of specific below grade structures associated with existing pump station and the installation of the new pump station structures. The work includes rehabilitation to the existing one-story brick controls building. The work requires coordination with all construction activities of a new Vo-Tech Building that is to be constructed adjacent to the pump station site as well as coordination with a new off-site private development connection to the new station. The overall work is located along Regional Road and State Highway 31 within the Township of Clinton. The overall work shall be completed within 240 calendar days of the Contractor's receipt of written Notice to Proceed.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents