Similar Projects
SL1604 - Erosion Repair
Infrastructure
Bidding
$155,541 est. value
TX

South Gevers Street Drainage Improvement Project
Infrastructure
Bidding
$8,600,000 est. value
San Antonio, TX 78275

Construction of Johnson Ranch North Unit 9 Public Water, Wastewater, Paving and Drainage Improvements and Johnson Ranch North Unit 9 Private Paving and Grading Improvements
Post-Bid
San Antonio, TX

Construction of Streets, Drainage, Water, and Wastewater for Somerset Grove Unit 1
Post-Bid
San Antonio, TX 78200

OP Schnabel Park Entrance and Bridge
Results
$783,000 est. value
San Antonio, TX

Z--IDIQ for Stream Gage Site Rprs, Oklahoma and Texas
Results

Reconstruction of Barnett Avenue
Infrastructure
Bidding
San Antonio, TX 78226

Olmos Park FY 2020-2021 Street and Drainage Maintenance
Post-Bid
Olmos Park, TX

SECO Creek Headgate Project
Results
San Antonio, TX 78215

Salado Creek Childsafe Connection
Infrastructure, Alteration
Bidding
$400,000 est. value
San Antonio, TX 78220

Redbird Ranch Phase 2 Unit 1M-3 and Unit 3M-3A
Post-Bid
TX 78253

Olmos Dam Drain Repair
Results
San Antonio, TX 78212

Repair Storm Drainage at The Medical Education Training Campus (METC).
Post-Bid
$500,000 to $1,000,000 est. value
San Antonio, TX 78275

West Byrd Drainage Improvements Phase 1
Results
Universal City, TX 78148

2020 Streets and Drainage Improvement Project
Infrastructure
Post-Bid
$7,527,271 est. value
San Antonio, TX

Last Updated 01/17/2022 07:32 AM
Project Title

Briarmall Area Drainage System

Physical Address View project details and contacts
City, State (County) San Antonio, TX   (Bexar County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,562,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Proposed project will include street reconstruction and an underground drainage system to alleviate flooding issues from a neighborhood outfall to the north. The proposed drainage system will consist of concrete channel reconstruction, box culverts and inlets along Briarmall, and tie in to an existing earthen channel approximately 100ft south of Briarcrest. No work will be done in the larger main channel downstream of construction limits.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents