Similar Projects
Annual Contract - Asphalt, Paving and Pathway Construction
Term Contract
Bidding
FL

Palm Beach Shores Water Main Improvement Project
Bidding
Riviera Beach, FL 33404

Construction of 7th St. Heritage Alley Improvements
Post-Bid
West Palm Beach, FL

Shore Protection Project (SPP) Mid-Town Segment and Phipps Ocean Park (Reach 7) Beach Renourishment 2019
Post-Bid
$10,000,000 to $25,000,000 est. value
Palm Beach, FL 33404

Palmetto Park Road from Southwest 7th Avenue to Southwest 5th Avenue
Results
Less than $4,950,000 est. value
FL

46--Water Purification System
Results
Palm Beach Gardens, FL 33410

Florida Mango Road, Edgewater Drive to South of Barbados Road
Bidding
Less than $3,200,000 est. value
West Palm Beach, FL 33413

Resurfacing City of Pahokee Roadways - Phase III
Post-Bid
Pahokee, FL 33476

J--Sanitary Sewage Lift Station
Results
West Palm Beach, FL 334106400

Unit 53 Arden - Parcels J, G-South and I-South Public Improvement Project
Bidding
North Palm Beach, FL

Lake Okeechobee S-191 Basin Surface Runoff Phosphorus Removal Using Innovative Technologies
Post-Bid
Less than $3,000,000 est. value
West Palm Beach, FL 33401

SE Florida Sediment Morphodynamics
Results
Everglades, Lake Worth, Miami, Palm Beach, FL 32207

Raw Watermain Improvements for Surficial Aquifer (SA) Wells 8A-12A and Site Demolition for SA Wells 6-12 (W1817B)
Bidding
Jupiter, FL 33458

Unit 11 PGA National - Ryder Cup Milling Resurfacing Project
Post-Bid
Palm Beach Gardens, FL

N--Domestic Water Isolation (Shutter) Valves (Va-19-00034342)
Results
Palm Beach Gardens, FL 334106400

Last Updated 06/23/2020 09:35 AM
Project Title

Nottingham Boulevard and Miller Avenue Utility Improvements

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL 33402   (Palm Beach County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Shoreline/Erosion/Drainage, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,500,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors to provide all labor, material and equipment necessary to perform the Project Work as defined in the Construction Drawings, Technical Specifications and General Conditions. The project scope includes the completion of road improvements as well as water sewer and drainage improvements in the area of Nottingham Boulevard and Miller Avenue

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents