Similar Projects
2021 Cdbg Water System Line Extension Project for Old Loudon Road at Creek Road
Infrastructure
Bidding
$130,000 CJ est. value
Knoxville, TN 37902

Robertson County Offices Parking and Stormwater
Infrastructure
Bidding
$300,000 CJ est. value
Springfield, TN 37172

TCAT HVAC, Plumbing and Lighting Upgrades
Alteration
Post-Bid
$640,000 est. value
Paris, TN 38242

Plumbing Service and Repair
Term Contract
Post-Bid
Less than $25,000 est. value
Nashville, TN

Correct Plumbing Piping and Replace Fixtures
Results
$5,000,000 to $10,000,000 est. value
Memphis, TN 38104

Pink Palace Museum - Mansion Plumbing Replacement
Alteration
Results
$48,900 est. value
Memphis, TN 38111

Water Bottle Filling Stations
Alteration
Post-Bid
Tazewell, TN

South Water Treatment Plant Piping Modifications
Infrastructure, Alteration
Results
Millington, TN 38053

Miscellaneous Plumbing Services Supplementary
Term Contract
Post-Bid
Knoxville, TN

Plumbing Improvement at Mill Creek Middle
Alteration
Results
$139,000 est. value
Nolensville, TN 37135

2018 Humboldt LPRF Parks ADA Building Improvements
Infrastructure
Post-Bid
Humboldt, TN

Floor Drains and Plumbing Upgrades
Renovation
Results
$821,212 CJ est. value
Nashville, TN 37203

Lawrenceburg Head Start Plumbing
Infrastructure
Post-Bid
Lawrenceburg, TN

Kinsler Ave. & Parkcliff Dr. Waterline Replacement
Infrastructure
Results
$321,589 CJ est. value
Kingsport, TN 37660

Plumbing Services Contract
Term Contract
Post-Bid
Johnson City, TN

Last Updated 07/18/2023 10:05 AM
Project Title

Trickling Filter Sludge Dewatering

Physical Address View project details and contacts
City, State (County) Brownsville, TN 38012   (Haywood County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $649,470 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project for which Bids are solicited will be delivered under one contract and consists generally of the following: CONTRACT 21-01 - TRICKLING FILTER SLUDGE DEWATERING which includes Trickling Filter WWTP Sludge Dewatering Renovations. Project Category Code: Water and Wastewater Facilities, Electrical Installation/Construction, Fittings and Valves, Sewer and Water Construction, Electrical and Controls, Water/Wastewater Infrastructure The allotted time for construction for this contract is two hundred seventy (270) calendar days. Liquidated damages for non-completion are $500 per calendar day. This project is being supported, in whole or in part, by federal funds awarded to Brownsville by the U.S. Department of the Treasury. Each potential bidder shall include with his payment his contractor's license number, bonding limit and license expiration date. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Instructions for Bidders. All bidders must be licensed general contractors as required by the Contractor's Licensing Act of 1976 of the General Assembly of the State of Tennessee and qualified for the type of construction being bid upon. Each bidder shall write on the outside of the envelope containing his bid his contractor's license number, the expiration date, and that part of the classification applying to this bid. If this is not done, the bid will not be opened. All bidders shall comply with all provisions of TCA 50-9-113 as it relates to Drug-Free Workplace requirements. The Contractor shall complete the Drug-Free Workplace Affidavit of the Prime Bidder form and submit it with his/her bid. The Contractor shall be responsible for any of its Subcontractor(s) compliance with said law. All bidders shall comply with all provisions of Chapter 878 of TCA 12-4-1 as it relates to certification of compliance regarding illegal immigrants. The Contractor shall complete the Statement of Compliance Certificate Illegal Immigrants and submit it with her/her bid. The Contractor shall be responsible for any of its Subcontractors compliance with said law. In compliance with TCA 12-4-126(a) and (b) the ENGINEER will not issue addenda less than forty-eight (48) hours before the bid opening date and time; further, any questions concerning the bid documents shall be received by the ENGINEER before ninety-six (96) hours prior to the bid opening date and time. The successful bidder is required to furnish both an acceptable performance bond and payment bond each in the amount of one hundred percent (100%) of the contract price. The Owner reserves the right to reject any all bids, to waive informalities, and to negotiate with the apparent qualified best bidder or bidders to such extent as may be necessary. No bidder may withdraw his bid for 90 days, while the Owner considers the bids. Mutually agreed upon time extensions may be made if necessary.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents