Similar Projects
Covy Court Stormwater Improvements
Infrastructure
Bidding
$800,000 est. value
Castle Rock, CO 80104

Titan / US 85 NB On-Ramp
Infrastructure
Bidding
$200,000 est. value
Castle Rock, CO 80108

Desert Ridge Place Storm Sewer Reconstruction
Post-Bid
Castle Rock, CO

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

Canyons Filing 1 3rd Amendment Storm Roadways Water and Sanitary
Results
Lone Tree, CO

Canyons Filing 1 3rd Amendment Storm Roadways Water and Sanitary
Results
Lone Tree, CO

2021 Community Roadwork
Infrastructure
Post-Bid
Highlands Ranch, CO 80126

Chesapeake Pipeline Replacement
Results
Highlands Ranch, CO 80129

2021 Woodmoor Mountain Road Project
Infrastructure
Post-Bid
CO

2021 Street Overlay
Results
Lone Tree, CO

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

2021 Concrete Replacement
Results
Less than $432,109 est. value
Lone Tree, CO

2021 Miscellaneous Concrete Replacement Project
Infrastructure
Post-Bid
Castle Rock, CO

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

CR Water Projects
Infrastructure
Post-Bid
Castle Rock, CO

Reported 06/18/2022 12:00 AM
Project Title

Construction Manager at Risk - Crestone Way Pipe Replacement and Widening Project (CMAR)

Physical Address View project details and contacts
City, State (County) Castle Rock, CO   (Douglas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Request for Proposals (RFPs), Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The initial design and construction portion is planned to consist of the approximately 2,500 linear feet centerline length. Improvements to the roadway include widening of certain sections of roadway, curb/gutter improvements, driveway cut improvements, associated storm sewer improvements, resurfacing of the entire width of the pavement, and replacement of the waterline located under the street section. Utilizing trenchless methodologies for replacement of the waterline may be preferred to traditional "cut and cover" methodologies due to accessibility and other negative impacts to the neighborhood.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents