Similar Projects
Central Division - Asphalt Paving Maintenance
Post-Bid

Street Maintenance - Sealcoating and Fog Coating
Post-Bid
Mapleton, IL

Reconstruction of Western Avenue
Results
Peoria, IL 61525

Princeville District Office Pavement Replacement
Results
Princeville, IL

Street Maintenance - Sealcoating and Fog Coating
Post-Bid
Bartonville, IL

Kickapoo Creek Road Structure Replacement
Results
Less than $1,500,000 est. value
Peoria, IL

Street Maintenance - Sealcoating
Post-Bid
Elmwood, IL

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

Construct Base Track
Post-Bid
$250,000 to $500,000 est. value
Peoria, IL

Overlay on IL 29 (Fourth Street) from Senachwine Creek to Truitt Avenue in Chillicothe with ADA Ramp Construction. Length =0.94 Mile.
Results
IL

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Greengold Road Overlay
Results
Less than $150,000 est. value
Hanna City, IL 61536

Sealcoating
Post-Bid
Peoria Heights, IL

Seal Coating Various Township Roads
Results
IL

Seal Coat
Alteration
Post-Bid
Princeville, IL

Last Updated 12/30/2021 10:38 AM
Project Title

Spring Lane and Orchard Lane Project

Physical Address View project details and contacts
City, State (County) Peoria, IL 61615   (Peoria County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed improvement consists of installing 615 linear feet of culvert pipes, 810 linear feet of storm sewer, and constructing roadside ditches within the street right of way. The work includes driveway reconstruction, relocating mailboxes as necessary, and restoration of surface conditions within the construction area.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents