Similar Projects
Last Updated | 01/24/2022 11:48 AM |
Project Title | East Ridge Multimodal |
Physical Address | View project details and contacts |
City, State (County) | East Ridge, TN 37412 (Hamilton County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction of US Highway 41/SR 8 (Ringgold Road) Corridor Improvement Project From Kingwood Dr./Wimberley Ln. To Mcbrien Rd. The Project Is Located At Ringgold Road, East Ridge Tennessee. The Work To Be Done Consists Of Ada Upgrades, a 10’ Shared Use Path On The South Side Of Ringgold Road And a 5’ Sidewalk On The North Side Of The Road, Including Demolition, Curb And Gutter, Drainage Structures And Reinforced Concrete Pipe, Concrete And Asphalt Pavement, Erosion Control, Road Signage, Traffic Signal Modifications, Traffic Control And Any Incidentals Needed To Complete The Project. The Total Project Length Is 1.193 Miles |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |