Similar Projects
Roofing Replacements
Alteration
Bidding
Lansing, MI 48933

Green/Live Roof Maintenance Services
Term Contract, Alteration
Bidding
MI

Dairy Barn Roof Reconstruction Project and Equipment Barn Project
Post-Bid
Rochester Hills, MI 48306

Roof Repair
Post-Bid
Montrose, MI 48457

VGLZ202030 Repair Roof B/894 & B/895
Results
$250,000 to $500,000 est. value
Harrison Township, MI 48045

2020 Roofing Repairs and Wet Insulation Replacement
Results
Royal Oak, MI 48073

SRC Section G Roofing Project
Alteration
Bidding
Big Rapids, MI 49307

New Station No. 1- EPDM Membrane Roofing
Post-Bid
Whitehall, MI 49461

MDOT Roof Coating Mason Garage
Results
Mason, MI 48854

Science Hall - Roof Replacement 2020
Post-Bid
Detroit, MI

Reserve Forces Support Center Replace Roof Building 30
Results
Lansing, MI 48906

FPE: Roofing
Post-Bid
Pontiac, MI 48341

Public Safety Building Roof Repairs and Annual Preventative Maintenance Program
Results
Less than $24,399 est. value
Berkley, MI 48072

Painting and Repair of Overhang Roof
Post-Bid
Lansing, MI 48933

Kemp Wing Roof Replacement Project
Results
Flint, MI 48507

Reported 12/07/2021 12:00 AM
Project Title

Northeast Roof Replacement

Physical Address View project details and contacts
City, State (County) Midland, MI 48642   (Midland County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Remove rock, tear off all roofing membrane, flashings down to the roof deck and dispose of legally 2. Remove any items identified by the owner as abandoned and dispose of legally. 3. Furnish and install 2 layers of new 2.6 Firestone ISO mechanically attached on metal deck areas. 4. Furnish and install a new 1/8” per foot Tapered ISO system fully adhered with Firestone insulation adhesive. 5. Furnish and install new fully adhered 90 mil EPDM. Provide all necessary details at projections, flashings, drains etc for a complete watertight system. 6. Furnish and install new ANSI/SPRI ES 1 kynar coated steel edge metal system gravel stop Firestone Anchor guard where applicable. 7. Provide a full system Firestone Red Shield 30 year warranty. 8. Alternate for fully adhered .060 EPDM 30 year system following the same procedures as the system listed above

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents