Similar Projects
Services Decommissioning of Monitoring/Recovery Wells within All Five (5) Boroughs of New York City
Term Contract, Infrastructure
Bidding
New York, NY

1,4-Dioxane, PFOA and PFOS Treatment at Wells 1A and 2R
Infrastructure
Bidding
$12,500,000 est. value
Carle Place, NY

Sanitary Sewer Improvements/Replacement of Grinder Pumps
Post-Bid
Sand Lake, NY 12153

Worthington Pump Rebuild at Water Pollution Control Facility
Post-Bid
Williamsville, NY 14221

Replace Relief Wells at Portville Flood Control Project
Results
$1,000,000 to $2,000,000 est. value
Portville, NY 14770

Furnish and Deliver Decant Pumps and Mixers for Erie County Water Authority
Results
Cheektowaga, NY 14227

Well 33
New Construction
Bidding
Woodbury, NY 11797

Pottersville Well #2 Improvements Project
Post-Bid
Pottersville, NY 12817

Replacement of Duplex Sump Pumps at School 23
Results
Yonkers, NY 10701

Electrical Improvements at Wells 3 & 4
Infrastructure, Alteration
Bidding
Carle Place, NY

Dewatering Pumps
Post-Bid
Valhalla, NY 10595

Wet Well Cleaning at Mohawk View Water Pollution Control Plant
Results
Latham, NY 12110

Pottersville Well 2 Improvements
Infrastructure
Bidding
Pottersville, NY 12860

SPC Building Hot Water Circulation Pumps at the Salt Point Center
Post-Bid
Poughkeepsie, NY 12601

Water System Improvements - Contract 3 - Well Development
Results
Less than $135,000 est. value
Cleveland, NY 13042

Last Updated 03/03/2022 12:23 PM
Project Title

Rehabilitation of Elmira Water Board Wells: Foster Island Well 40 and 41

Physical Address View project details and contacts
City, State (County) Elmira, NY   (Chemung County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this proposal is to clean and rehabilitate the Elmira Water Board Wells: Foster Island Well #40 & Foster Island Well #41. The Contractor shall furnish and supply all necessary rigging and associated equipment to perform a thorough cleaning of the well screens and rehabilitation of the wells. This item includes moving material and equipment to and from the site. It also includes clean-up of the well site at completion of the contract. (a) The Contractor shall remove any debris from the bottom of the well using a bailing or air lifting method approved by the Owner’s representative to the depth specified by the Well Design. The debris, if any, shall be collected at the surface and properly disposed of off-site. (b) The Contractor is responsible for the containment, removal, and disposal of all sludge and debris as part of this contract.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents