Similar Projects
Schools - Wastewater Replacement at Silk Hope School - Chatham County
Infrastructure
Conception
$585,000 CJ est. value
Siler City, NC 27344

Schools - Wastewater Replacement at Silk Hope School - Chatham County
Infrastructure
Conception
$585,000 CJ est. value
Siler City, NC 27344

Friendship Village Multi-Residential Development / Apex
New Construction, Infrastructure
Design
$45,000,000 CJ est. value
Apex, NC 27502

Summit Terrace Residences
New Construction, Infrastructure
Design
$7,000,000 CJ est. value
Pittsboro, NC 27312

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Construction of Concrete Sidewalk
Infrastructure
Post-Bid
$200,000 CJ est. value
Pittsboro, NC 27312

Signal Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Pittsboro, NC 27312

Haywood Road Waterline Improvements
Results
Pittsboro, NC 27312

Microsurfacing Treatment
Infrastructure
Results
$765,330 CJ est. value
Apex, NC 27523

The Oak View at Siler City Apartments
New Construction, Infrastructure
Construction
$12,500,000 CJ est. value
Siler City, NC 27344

Project Real
New Construction, Infrastructure - 150,000 SF
Pending Verification
$16,000,000 CJ est. value
Apex, NC 27502

Sanford Road Residential Development
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Pittsboro, NC 27312

John Palmour Manufacturing Center for Silicon Carbide
New Construction, Infrastructure
Conception
$5,000,000,000 CJ est. value
Siler City, NC 27344

Farm at Penny Lane
New Construction, Infrastructure
Design
$3,500,000 CJ est. value
Pittsboro, NC 27312

Chatham Business Drive
Infrastructure
Results
$134,628 CJ est. value
Pittsboro, NC 27312

Last Updated 02/10/2023 10:22 AM
Project Title

Wastewater Transmission System Improvements - Contract II

Physical Address View project details and contacts
City, State (County) Pittsboro, NC 27312   (Chatham County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $39,588,650 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 9, 2023, the project has not been awarded as bids are still under review. An exact timeline for award has not been established, however, the project is scheduled to be discussed at a town board meeting scheduled for February 13, 2023. Contract II of Wastewater System Improvements for the installation of wastewater transmission lines, including: Approximately 57,500 LF of 18 force main and appurtenances by open cut Approximately 10,200 LF of 18 force main by horizontal directional drill Approximately 1,100 LF of 30 steel encasement and 18 force main by bore and jack Bidders will be required to show evidence that they are licensed to perform the work in the Bidding Documents as required by North Carolina General Statute, Chapter 87 and the Instructions to Bidders. Bid Security in the amount of five percent of the Bid must accompany each Bid and shall be subject to the conditions provided in the Instructions to Bidders. Owner is an Equal Opportunity Employer and does not discriminate. Small, minority and womans businesses and labor surplus area firms are encouraged to submit bids. Bidding Documents may be examined at Engineer and Owner office After Bids are opened, the Owner shall evaluate them in accordance with the methods and criteria set forth in the Instructions to Bidders. The Owner reserves the right to waive any informality or to reject any or all Bids. Unless all Bids are rejected, Award will be made to the lowest responsible Bidder, taking into consideration quality, performance and the time specified in the proposals for the performance of the Contract. Questions regarding the project may be emailed. Email address is cdavis@thewootencompany.com. Preference is for all questions to be provided in writing. Cut-off for questions will be October 31, 2022.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents