Similar Projects
Daves Creek Road Emergency Culvert
Infrastructure
Bidding
GA 30041

Greensferry Stream and Floodplain Restoration
Infrastructure
Bidding
Atlanta, GA 31175

Hanarry Point Drainage Improvement Project
Post-Bid
Lawrenceville, GA 30045

Site Development-Cross Hill Trail, Lot 7 Project
Post-Bid
Lawrenceville, GA 30046

Sweetwater Creek Rehabilitation - Phase 1
Results
Less than $2,022,280 est. value
East Point, GA

Claradon Avenue and Benning Drive Culvert Work
Results
Columbus, GA

Hightower Road and Cooper Road NE - Grading, Drainage, Base and Paving
Infrastructure
Bidding
Valdosta, GA

Repair of Storm Water Drainage Systems
Post-Bid
Snellville, GA 30078

Turner County 2018 CDBG - Legg Road
Results
Less than $430,000 est. value
GA

East Augusta Roadway and Drainage Improvements
Infrastructure
Bidding
Augusta, GA 30901

Street and Drainage Improvements Flint Drive
Post-Bid
Less than $360,000 est. value
Douglas, GA

Smith Street Drainage Improvements
Results
Hagan, GA 30429

Shoals Street Drainage and Street Improvements
Infrastructure
Bidding
Warrenton, GA

Water Drainage at Carl City Park
Post-Bid
Carl, GA 30203

Street and Drainage Improvements to Cottonwood Road
Results
Douglas, GA 31533

Last Updated 07/15/2021 01:39 PM
Project Title

Culvert Replacement Projects

Physical Address View project details and contacts
City, State (County) GA   (Clayton County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,000,000 to $7,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Location / Site Directions: Site 1 - Flat Shoals Rd. at Camp Creek Site 2 - Pineridge Drive at Jester Creek Site 3 - Cynthia Lane at Jester Creek Site 4 - Southlake Parkway 1 south of April Lane Site 5 - Southlake Parkway 2 south of Southlake Parkway 3 Site 6 - Southlake Parkway 3 at Reeves Creek The Project includes, but is not limited to, the following upgrades: A: Six (6) new culverts B: Utility relocations C: Flow diversion systems D: Milling and paving. E: Replacement of sidewalks, curbs, and gutters F: Erosion and sediment controls

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents