Similar Projects
Harris Road Middle School Dining Room Enclosure
Renovation
Bidding
$250,000 est. value
Concord, NC 28027

Griffin Middle School Dining Room Enclosure
Renovation
Bidding
$250,000 est. value
Concord, NC 28025

Cms Mountain Island Lake Academy Addition
Addition
Sub-Bidding
$10,488,400 est. value
Charlotte, NC

RFI - Home Intrusion Detection Systems (CONUS/OCONUS)
Post-Bid

South Campus Bluelight Tower Upgrade
Post-Bid
Concord, NC

Force Protection Site Security System Solutions (FPS4) Final Request for Proposal (RFP)
Results
$700,000,000 est. value

National Physical Security (NPSP) Maintenance and Installation
Results
Less than $29,000,000 est. value

Jay M. Robinson High School Security Vestibule
New Construction, Alteration
Bidding
$250,000 est. value
Concord, NC 28027

Modular School Building Upgrade Project
Renovation
Post-Bid
Kannapolis, NC 28083

Commercial Ethernet Gateway (CEG) - Continental United States (CONUS) Region One
Results

Hickory Ridge High School - Security Vestibule
New Construction, Alteration
Bidding
$250,000 est. value
Harrisburg, NC 28075

Central Station Alarm Monitoring (CSAM)
Post-Bid

Building Automation System (BAS) Installation & Maintenance Enterprise-wide Services
Results

NCCU - The New Student Center - AV Package
Alteration
Post-Bid

Wired Telecommunications Services (North Carolina)
Results

Reported 03/04/2022 12:00 AM
Project Title

Entry Vestibules and Cafeteria Renovations

Physical Address View project details and contacts
City, State (County) Concord, Harrisburg, NC 28075   (Cabarrus County)
Category(s) Education, Single Trades
Sub-Category(s) Middle/Senior High School, Security/Communications
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $250,000
Plans Available from Architect - 02/15/22
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of: 1. Hickory Ridge High School – Entry Vestibule - 7321 Raging Ridge Rd, Harrisburg, NC 28075. 2. Jay M Robinson High School – Security Vestibule - 300 Pitts School Rd SW, Concord, NC 28027. 3. CC Griffin Middle School – Cafeteria Renovations - 7650 Griffins Gate Dr SW, Concord, NC 28025. 4. Harris Road Middle School – Cafeteria Renovations - 1251 Patriots Pride Blvd, Concord, NC 28027. Project consists of Renovation of existing break room space to for a new entry vestibule for visitors.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents