Similar Projects
2.0 Million Gallon (MG) Water Tank Pipeline
Infrastructure
Bidding
$3,475,000 est. value
Monument, CO

6-Inch CIP Water Main Lining
Infrastructure
Post-Bid
Colorado Springs, CO 80900

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Centralized Treatment Raw Water Line
Results
$300,000 to $350,000 est. value
Colorado Springs, CO 80906

Northern Regional Water Delivery Project Segment D
Infrastructure
Construction
Less than $500,000 est. value
Monument, CO

Upper West to East Water Transmission Line
Infrastructure
Post-Bid
$8,000,000 est. value
Colorado Springs, CO 80902

Well No 4 Treatment Plant Connection Line
Results
Fountain, CO

Fire Hydrant Flushing
Term Contract
Post-Bid
Manitou Springs, CO

Water System Improvement Project
Results
Falcon, CO

Adaman Alley Construction Services
Infrastructure
Post-Bid
$1,500,000 to $2,000,000 est. value
Colorado Springs, CO

Water Utility Construction Services
Results
Less than $23,665 est. value
Colorado Springs, CO 80919

Rolling Hills Tank Inlet Pipeline
Results
Colorado Springs, CO

Cellular Domestic Water Meter Installation
Results
Colorado Springs, CO

Monument Raspberry Lane Street and Waterline Improvements
Results
Less than $100,000 est. value
Monument, CO 80132

Reported 05/28/2022 12:00 AM
Project Title

Northern Regional Water Delivery Project - Segment C

Physical Address View project details and contacts
City, State (County) Monument, CO   (El Paso County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed generally includes: tie-in to the existing 16" DIP water line and installation of a sample hydrant. Supply and construction of approximately 2,105 LF of 16" DR18 C900 PVC. Supply and construction of approximately 1,371 LF of 16" C900 DR18 fusible PVC via horizontal directional drilling. Supply and construction of approximately 1,020 LF of 12" C900 DR18 PVC. Supply and installation of DIP fittings, (7) 16" butterfly valves, (9) 12" gate valves, (3) air/vac vaults, (1) precast concrete vault with an air/vac valve, (1) 4" blowoffs, disinfection, testing, concrete thrust blocks, clearing & grubbing, erosion control BMPs, stormwater management plan & permits, concrete & asphalt removal, concrete & asphalt repair, traffic control, trail repair, seeding & revegetation, and all incidental work required to complete the project as specified in the drawings and specifications.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents