Similar Projects
Chestnut Avenue and West Hollywood Circle Storm Drainage Improvements
Post-Bid
Pennsauken, NJ

Cherry Lane Drainage Improvements
Post-Bid
Clementon, NJ 08021

Drainage Improvements, Cafeteria - Welding Room Parking Lot
Results
Pennsauken, NJ 08109

Roadway and Drainage Improvements Along Fern Avenue (CR 640), from Vicinity of Haddon Avenue (CR 561) (MP 0.00) to Vicinity of Cuthbert Boulevard (CR 636) (MP 0.67), Borough(s) of Collingswood and Haddon Township
Results
Camden, NJ 08021

Reconstruction/Storm Drainage Improvements to West Evergreen Avenue, Phases 2 and 3, from Hilltop Avenue to East Atlantic Avenue
Post-Bid
Somerdale, NJ 08083

Maintenance Timber/Underwater/ Drainage Structural Repair Contract, South - 2019
Results
$5,000,001 to $10,000,000 est. value

Barry Place Drainage Improvements Project
Post-Bid
Clementon, NJ 08021

Drainage Restoration Contract, Statewide-2018; Various Sites Statewide
Results
$5,000,001 to $10,000,000 est. value

Sinkhole Repairs at Pier 1 Broadway Terminal
Post-Bid
Camden, NJ 08104

Culvert Wall Restoration on North Park Drive in the Township of Cherry Hill
Results
Cherry Hill, NJ

FY 2015 Discretionary Aid, Drainage Improvements to Bell Road
Post-Bid
Mount Ephraim, NJ 08059

Stormwater Outfall and Drainage Improvements
Results
Haddonfield, NJ 08033

Kresson Road (CR 671) Roadway and Drainage Improvements from Brace Road (NJSH 154) to Howard Johnson Road
Post-Bid
Cherry Hill, NJ

Immediate and Scheduled Repairs of Drainage Structures and Underground Facilities
Results

North Camden Green Infrastructure Project
Post-Bid
Camden, NJ 08104

Reported 01/17/2019 12:00 AM
Project Title

2019 Construction of Impoundment Improvements at Joe's Lake Park

Physical Address View project details and contacts
City, State (County) Cherry Hill, NJ   (Camden County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description Consists of the installation of approximately 45 linear ft of 15 ft long steel sheet piling to cut off seepage through the existing spill box impoundment. The improvements will include a closure pour consisting of approximately 5 cu yards of concrete. The improvements will also include temporary erosion control measures in the form of silt fence & a floating turbidity barrier.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents