Similar Projects
New Bedford High School Pool Structure Repair Project - Sub Bid
Alteration
Sub-Bidding
$1,250,000 est. value
New Bedford, MA 02740

Remove and Replace Existing Kitchen Drains - Sub bid
Infrastructure, Alteration
Sub-Bidding
$178,000 est. value
New Bedford, MA

On-Call, Routine and Emergency Plumbing Response and Repair Work
Term Contract
Post-Bid
Less than $107,000 est. value
New Bedford, MA

Plumbing Maintenance and Repair Service Contract
Term Contract, Alteration
Post-Bid
Less than $50,000 est. value
Attleboro, MA

Bathroom Sink, Drain and Faucet Replacement
Results
$126,285 est. value
Norton, MA

Roof Replacement and Associated Work at The Community Elementary School - Sub Bid
Results
$1,400,000 est. value
North Attleborough, MA 02760

Plumbing Services for Public Buildings
Alteration
Post-Bid
Norton, MA

Pipe Fittings First Floor Building K
Results
$45,000 est. value
Fall River, MA

Adamsdale Well Pump Station with a New Building
Alteration
Post-Bid
$3,700,000 est. value
North Attleborough, MA

On-Call Plumbing Services
Term Contract
Results
$20,860 est. value
Easton, MA

On-Call Trades Service Specifically Painting, Electrical, Plumbing, Carpentry, Glass/Window-Door Fabrication
Alteration
Post-Bid
$20,000 est. value
Fall River, MA

Cardinal Medeiros Boiler and Domestic Water Heater Replacement -Filed Sub-Bids
Alteration
Results
$265,540 est. value
Fall River, MA 02720

Plumbing Systems
Term Contract
Post-Bid
New Bedford, MA

Toilets, Heat Replacement, Bath Fans and Siding
Alteration
Results
$1,040,000 est. value
New Bedford, MA

Taunton Lab Upgrades
Alteration
Post-Bid
$65,000 est. value
Hudson, Taunton, MA 02780

Last Updated 06/16/2022 08:05 AM
Project Title

Low Flow Water Closets

Physical Address View project details and contacts
City, State (County) Taunton, MA 02780   (Bristol County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $23,805
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

At 46 toilets remove and replace: two-piece water closet, wax ring, bolts, water shut-off valve and water supply line from shut-off. a. Owner will determine locations of toilets to be replaced, at various dwelling units throughout the development. 2. If discovered to be severely deteriorated during demolition, remove and replace existing cast iron flange.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents