Similar Projects
Owners Project Manager for the Construction of Wastewater Treatment Facility and Phase 1 of Sewer Collection System
New Construction
Bidding
$160,000,000 est. value
West Yarmouth, MA

Equalization Basin No.3 and 4 at the Wareham Water Pollution Control Facility
Post-Bid
Less than $2,000,000 est. value
Wareham, MA 02571

WWTP Aerator 2B Replacement Project
Post-Bid
Great Barrington, MA 01230

Wastewater Treatment Facility Upgrades - Filed Sub-Bids
Results
Less than $12,975,000 est. value
Orange, MA 01364

Wastewater Treatment Facility Upgrades - General Bids
Results
Less than $12,975,000 est. value
Orange, MA 01364

Buzzards Bay Wastewater Treatment Facility - General Bid
Construction
Less than $6,000,000 est. value
Bourne, MA 02532

Downtown Area Wastewater Treatment Facility (WWTF) and Effluent Disposal - General Bid
Construction
$22,000,000 est. value
Orleans, MA 02653

Wastewater Treatment Facility - Alum Flow Pacing Improvements
Post-Bid
Less than $50,000 est. value
Ayer, MA

WWTF - Septage Receiving Upgrade
Results
Less than $1,250,000 est. value
Scituate, MA 02066

Expansion of the Kingston Wastewater Treatment Plant - General Bid
Construction
Less than $18,000,000 est. value
Kingston, MA

Wastewater Effluent Launder Covers
Post-Bid
Marshfield, MA

Sludge Activating Aerators and Installation
Results
Salisbury, MA

Capital Improvements and Long Term O and M
Post-Bid
Lynn, MA

Wastewater Treatment Facility Solids Handling and Septage System Upgrades - General Bid
Renovation
Results
$2,000,000 est. value
Edgartown, MA 02539

Owner`s Project Manager Services for Martha's Vineyard Airport Waste Water Treatment Facility Upgrades
Post-Bid
West Tisbury, MA

Last Updated 12/23/2021 03:00 AM
Project Title

WWTF Control Building Upgrades & HVAC System Replacement - General Bid

Physical Address View project details and contacts
City, State (County) Hull, MA   (Plymouth County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Town of Hull, MA invites bidders to submit sealed bids for the Hull Wastewater Treatment Facility Control Building Upgrades & HVAC System Replacement Project, which includes, but is not limited to, replacement of selective demolition to the mechanical, electrical, and plumbing systems, as well as walls and other architectural and structural elements to facilitate the new work. New HVAC systems include a gas fired boiler plant, hot water piping system, a roof mounted air handler, indoor air handlers, exhaust fans, associated ductwork distribution systems, VRF heat pump systems, and associated local HVAC controls. New Electrical systems include upgrades to provide power and lighting to the new office areas, HVAC equipment, and hazardous gas detection systems. New plumbing systems include improvements related to the new office space, boiler room, and HVAC equipment. A new natural gas service will be provided. The work shall be completed within 360 days from the commencement of Contract Time.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents