Similar Projects
Reported | 12/23/2021 12:00 AM |
Project Title | Bass Lake Pump Station Upgrade Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Holly Springs, NC (Wake County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Professional Engineer to provide 100% design and obtain permits required for upgrades to the Bass Lake Pump Station. The Bass Lake Pump Station Phase 2 Upgrade will increase capacity from 1,200 gallons per minute (GPM) to 2,069 GPM at 216 feet TDH. The upgrade will consist of: 1. the evaluation of existing pump station performance, layout, equipment, underground storage, and pipe sizes; 2. the evaluation of existing gravity sewer and force main; and 3. the design of necessary improvements to renovate and reuse existing conditions and/or add pumps, electrical components, and other infrastructure. Additionally, upgrades to the Bass Lake Pump Station will need to be coordinated with the proposed East Regional Pump Station. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |