Similar Projects
Tidal Wave Car Wash / St Peters
New Construction, Infrastructure - 5,400 SF
Design
$1,400,000 CJ est. value
Saint Peters, MO 63376

Jim Hennessey Trail Extension to Meadowlake Drive
Infrastructure
Bidding
$129,907 CJ est. value
Cottleville, MO 63304

Spring Lakes #1 Lift Station Improvements
Infrastructure, Renovation
Bidding
$800,000 CJ est. value
Cottleville, MO 63366

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

HDPE Pipe and Fittings for West Pearce Waterline
Infrastructure
Post-Bid
Wentzville, MO 63385

Town Vacuum System Canister Replacement
Infrastructure
Results
Saint Charles, MO

HDPE for Interstate Drive
Infrastructure
Results
Wentzville, MO

Reserve at St. Peters
New Construction, Infrastructure
Pending Verification
$53,000,000 CJ est. value
Saint Peters, MO 63376

Little Sunshine's Playhouse & Preschool
New Construction, Infrastructure - 11,354 SF
Pending Verification
$2,000,000 CJ est. value
Lake Saint Louis, MO 63367

Flow Meter Calibration
Infrastructure
Bidding
$68,000 CJ est. value
Cottleville, MO 63366

Chicken N Pickle - Package 2
New Construction, Infrastructure - 24,162 SF
Post-Bid
$5,000,000 CJ est. value
Saint Charles, MO 63303

36 Sanitite Hp Triple Wall Pipe
Infrastructure
Results
O Fallon, MO

Kisker And Route 364 Self Storage
New Construction, Infrastructure - 124,032 SF
Pending Verification
$14,000,000 CJ est. value
Saint Peters, MO 63376

Busch (August A) Mem CA Lake 33 and 34 Floating Dock Replacement
Infrastructure
Bidding
$55,000 CJ est. value
Augusta, MO 63332

2022 Sewer Lateral Cleaning, Televising, and Emergency Repair
Infrastructure
Post-Bid
Lake Saint Louis, MO

Last Updated 09/13/2022 08:04 AM
Project Title

Drainage Improvements

Physical Address View project details and contacts
City, State (County) Saint Charles, MO 63301   (Saint Charles County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $701,781 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J6M3422 Route 370 ST CHARLES County. Drainage Improvements from New Town Road to Boschertown Road, the total length of improvement being 0 miles. Range: $500K - $750K Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. MODOT - F05 - Drainage Improvements *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents