Similar Projects
Slate Valley Walking Trail
New Construction - 3,600 SF
Design
Less than $15,000 est. value
Poultney, VT 05764

Pearl Street Sidewalk Reconstruction
Bidding
Johnson, VT 05656

Waterville Elementary School Parking Lot Resurfacing
Bidding
Waterville, VT 05492

Slip Formed Concrete Curbing 2020
Post-Bid
Rutland, VT

STP CVRT(2) - Winooski River Bridge and Bike Path Construction
Post-Bid
Montpelier, VT

Milton STP BP16(10) (US Route. 7 Gap Project)
Results
$970,995 est. value
Essex Junction, VT

Sidewalk Replacement Fair Haven Rest Area
Results
Fair Haven, VT

2021 Sidewalk Improvements
Bidding
Springfield, VT

IQ004 Indefinite Delivery / Indefinite Quantity Primary Contracts –Contractor On-Ramp
Post-Bid
Montpelier, VT 05633

West Rutland Sidewalk Segments STP BP15(1)
Results
$500,000 to $1,000,000 est. value
West Rutland, VT 05777

Sidewalk to Missisquoi Valley Union High School Swanton STP BP19(5)
Post-Bid
Swanton, VT

Vermont Route 7 Milton Streetscape Project - South
Results
$324,720 est. value
Milton, VT

Lyndon Town School Sidewalks
Post-Bid
Lyndonville, VT 05851

Design and Construction of Foot Trail at Taconic Mountain Ramble State Park
Results
$25,000 est. value
Hubbardton, VT 05743

Concrete Sidewalk Installation
Post-Bid
Rutland, VT 05702

Last Updated 04/30/2020 11:43 AM
Project Title

Fair Haven Rest Area Sidewalk Replacement

Physical Address View project details and contacts
City, State (County) Fair Haven, VT   (Rutland County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $24,345
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of, but is not limited to job meetings, submittals, removal and disposal of existing brick and granite pavers and subbase, complete removal of two trees, subbase excavation and installation of new gravel base and installation of new concrete sidewalks. Limits of new concrete sidewalk will be the same as the existing brick pavers. Fencing and/or barricades will be required to protect both construction work and the public. Cleanup, topsoil, seeding, and mulching will be done as soon as possible. All work shall be coordinated with BGS and the State Rest Area representative, and access to the building must be maintained at all times, utilizing the rear entry door on a limited basis. Work shall be substantially complete by 05/08/20 and progress uninterrupted until completion. The contactor shall restore the lawns, including repairs, grading, seeding and mulching as needed.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents