Similar Projects
Medical and Communication Building 2000 Repairs at Forbes Field
Renovation
Design
$1,000,000 to $5,000,000 est. value
Topeka, KS

IDIQ MATOC
New Construction
Design
Kansas City, KS

Fort Leavenworth Mission Training Complex (MTC) Guard Shack Replacement - AGD
Renovation
Bidding
$672,000 CJ est. value
Fort Leavenworth, KS 66027

Fort Riley Building 404
Renovation
Post-Bid
Fort Riley, KS 66442

Add-Alter Security Forces Squadron Facility Building 52
Renovation, Addition - 10,983 SF
Post-Bid
$1,000,000 to $5,000,000 est. value
McConnell AFB, KS

Building #77 Remodel Latrines & Add Room
Renovation
Results
Fort Leavenworth, KS

Roadwork, Road Repair, Maintenance and Construction MATOC
New Construction, Term Contract
Results
Kanopolis, KS - Blue Springs, Saint Charles, MO

VISN 15 Construction Renovate EHRM Training Room-Topeka
Renovation
Design
$2,000,000 CJ est. value
Topeka, KS 66622

Fy22 Mcconnell Afb - Multiple Award Construction Contract (Macc)
Renovation
Post-Bid
$2,000 to $10,000,000 est. value
McConnell AFB, KS 67221

Design Build - Ft Riley Barracks 7081 A, B, E, F Renovation
Renovation
Post-Bid
$25,000,000 to $100,000,000 est. value
Sylvan Grove, KS 67481

Building 670 Construction Addition
Addition, Demolition
Post-Bid
$1,000,000 to $5,000,000 est. value
KS

Repair Bldg 412 HVAC Phase 2
Build-out, Renovation
Post-Bid
$5,000,000 CJ est. value
McConnell AFB, KS 67221

Add Offices to Building 65 for FSS, MSG and Wing HQ
Renovation
Post-Bid
$500,000 CJ est. value
McConnell AFB, KS 67221

Last Updated 09/13/2022 04:06 PM
Project Title

Hiawatha Readiness Center Roof, Concrete and Structural Repairs Monitoring Adjutant General's Department (AGD)

Physical Address View project details and contacts
City, State (County) Hiawatha, KS 66434   (Brown County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

All contractors bidding as the prime bidder on this project must be pre-qualified with Office of Facilities and Property Management to bid this project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents