Similar Projects
Wekiwa Springs Septic Tank Retrofit Project Phase 2
Infrastructure
Bidding
$6,172,440 est. value
FL

Wastewater Gravity Cleaning and Closed Circuit Televising (CCTV) Services
Term Contract, Infrastructure
Bidding
$3,699,463 est. value
FL

LS 57 SW Quad Gravity Sewer Rehabilitation Project
Post-Bid
$3,055,000 est. value
Orlando, FL

Lift Station 139 Force Main Replacement
Results
Less than $2,390,000 est. value
Orlando, FL 32802

Cast Iron Manhole Covers, Rings, Frames and Grates
Term Contract
Results
Orlando, FL 32801

Corrections Genesis Sanitary Pipe Replacement
Infrastructure
Bidding
$1,800,000 est. value
Orlando, FL 32839

Wastewater Contract Services
Term Contract
Results
Less than $2,000,000 est. value
Orlando, FL 32816

Sanitary Sewer Lining and Manhole Rehabilitation
Infrastructure
Bidding
$5,000,000 est. value
Orlando, FL

Orange County Gravity Replacement Package 29
Results
Less than $995,285 est. value
Orlando, FL 32801

Utilities Gravity Replacement Package 3
Results
Less than $2,882,842 est. value
Orlando, FL 32818

Utilities Force Main East Package 1
Results
Less than $1,041,526 est. value
FL

Utilities Gravity System Improvements Package 30
Results
Less than $1,201,895 est. value
FL

Utilities SCADA Panel Replacement Package 1
Results
$2,492,797 est. value
Orlando, FL

Wifia Ls 42-P, Ls 43-P, Ls 44-P, Ls 45-P, Ls 46-P, Ls 47-P, And Ls 54-P Gravity Sewer Rehabilitation
Results
Less than $5,994,747 est. value
Orlando, FL 32800

Wekiwa Springs Septic Tank Retrofit Project Phase 1
Results
$8,422,953 est. value
FL

Last Updated 03/02/2022 08:59 AM
Project Title

Cured-In-Place Gravity Main Lining

Physical Address View project details and contacts
City, State (County) FL   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $765,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of furnishing all labor, equipment and materials for the construction of cast-in-place pipe (CIPP) liners. Work covered by this contract includes, but is not limited to, cleaning and televising sewer mains and laterals, installation of CIPP liner systems, rehabilitation and reconnection of existing service laterals, CCTV inspection before and after rehabilitation work. Work includes all associated site work and restoration.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents