Similar Projects
Sewer Projects: Don Avenue/Curtis Street - City of Anderson
Infrastructure
Conception
$500,000 CJ est. value
Anderson, SC 29624

Sewer Projects: Don Avenue/Curtis Street - City of Anderson
Infrastructure
Conception
$500,000 CJ est. value
Anderson, SC 29624

Infrastructure Water Line Removal - West Market Street Roundabout - City of Anderson
Infrastructure
Design
$310,000 CJ est. value
Anderson, SC 29624

Infrastructure Water Line Removal - West Market Street Roundabout - City of Anderson
Infrastructure
Design
$310,000 CJ est. value
Anderson, SC 29624

J.D. Lever Elementary Multipurpose Building
Addition, Demolition, Renovation, Infrastructure
Bidding
$9,000,000 CJ est. value
Aiken, SC 29803

Resurface Abbeville CTC
Infrastructure
Bidding
$700,000 CJ est. value
Abbeville, SC 29620

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Public Works Campus Site Improvements
Infrastructure
Results
$567,800 est. value
Aiken, SC 29801

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Olive Garden Italian Kitchen / Aiken
Demolition, New Construction, Infrastructure - 7,831 SF
Construction
$2,300,000 CJ est. value
Aiken, SC 29803

Tiger Cove RV Park
New Construction, Infrastructure - 3,000 SF
Construction
$6,000,000 CJ est. value
Anderson, SC 29626

Techtronic Industries Manufacturing Plant and Warehouse
Addition, Demolition, Infrastructure - 1,000,000 SF
Pending Verification
$75,000,000 CJ est. value
Anderson, SC 29621

PAM Health Rehabilitation Hospital of Aiken
New Construction, Infrastructure
Pending Verification
$26,904,973 CJ est. value
Aiken, SC 29801

Generostee Relief Sewer - City of Anderson
Infrastructure
Conception
$19,300,000 CJ est. value
Anderson, SC 29624

Last Updated 06/21/2023 10:16 AM
Project Title

Gifford Lift Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Brunson, SC 29911   (Hampton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $668,010 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 6, 2022, the project has been awarded. A timeline for construction has not been confirmed. The project consists of the rehabilitation of the entire Gifford Lift Station and the replacement of 14 air release valves along the 6-mile force main. The rehabilitation includes the demolition of existing pumps, controls, and piping, coating the existing wet well with epoxy resin, replacing top of wet well slab and hatch, installing new pumps, control, site fencing, permanent stand-by generator, automatic transfer switch, and above grade piping. Construction Cost Range: $400,000.00 - $425,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents