Similar Projects
Applecross Pump Station Replacement - City of Hoover
Renovation
Conception
$685,000 CJ est. value
Hoover, AL 35242

Lagoon Upgrades
New Construction, Renovation, Infrastructure
Bidding
$420,000 CJ est. value
Vernon, AL 35592

Well 16 - Installation and Well Development
Infrastructure
Bidding
$400,000 CJ est. value
Trussville, AL 35173

Campus Area Water Distribution System and Instrumentation Upgrades - Proposal "C" Project
Post-Bid
Tuscaloosa, AL

Construction of Sewage Pumping Station Rehabilitation
New Construction
Post-Bid
$260,000 est. value
New Brockton, AL

Baltzell Lift Station Elimination
Results
Anniston, AL 36202

Econchate WPCP 2020 Improvements Project
Results
$22,996,000 est. value
Montgomery, AL

Fort Morgan Road Sewer Improvements - Marina Lift Station and Peninsula Lift Station
Renovation
Construction
Gulf Shores, AL 36547

Abandonment of Water Supply Well No. 4
Infrastructure
Construction
$50,000 CJ est. value
Enterprise, AL 36330

Fisher Area Sewer Expansion
New Construction, Infrastructure
Bidding
$1,300,000 CJ est. value
Good Hope, AL 35055

Primary Lift Station Improvements
Renovation
Post-Bid
Reform, AL

Leeds Parkway Drive Pump Station SSO Abatement
New Construction
Results
$6,900,000 to $7,400,000 est. value
Leeds, AL

Day Street Pump Station Chlorine Gas Conversion and High Service Pump No. 2 Replacement
Renovation, Infrastructure
Bidding
$200,000 CJ est. value
Montgomery, AL 36108

Lift Station 1 Improvements Phase 2
New Construction
Post-Bid
Guntersville, AL

Construction of Heiche Building Pump Station
New Construction
Results
$377,600 est. value
Jasper, AL 35501

Last Updated 10/06/2022 03:34 PM
Project Title

Woodford Pump Station Replacement - City of Hoover

Physical Address View project details and contacts
City, State (County) Hoover, AL 35226   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $515,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined. This project is in included in the City of Hoover FY 2022 Capital Improvement Plan (CIP). As of March 24, 2022, information regarding a design firm and the general contractor selection timeline has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to spring of 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents