Similar Projects
Academica K - 12 Charter School
New Construction
Conception
Royal Palm Beach, FL 33411

Polk County Charter School
New Construction
Conception
Davenport, FL 33896

Selby Garden Master Plan
New Construction - 99,500 SF
Design
Sarasota, FL 34236

Miami Produce Center
New Construction - 1,356,000 SF
Design
Miami, FL

Jones High School Capital Renewal Project
Post-Bid
Orlando, FL 32805

George Washington Carver Middle School Renovations
Post-Bid
Less than $2,799,203 est. value
Coral Gables, FL 33133

MA Milam K-8 Center (Phase 1) - Renovations & PE Shelter Replacement
Renovation
Results
Less than $4,143,452 est. value
Hialeah, FL 33012

Palmetto Charter School New Classroom Building
- 54,009 SF
Results
Palmetto, FL 34221

The Pine School
Addition - 22,369 SF
Construction
$6,800,000 est. value
Hobe Sound, FL 33455

Colonial 9th Grade Center Capital Renewal Project
Construction
$3,500,000 est. value
Orlando, FL 32807

K-12 International Boarding School
New Construction
Design
Panama City, FL 32409

Rickards High School New Construction, Remodeling, Renovations and Site Improvements Project
New Construction
Post-Bid
Less than $30,000,000 est. value
Tallahassee, FL 32301

Sunrise Middle School - SMART Program Renovations
Renovation
Results
Less than $1,805,189 est. value
Fort Lauderdale, FL

New High School Liberty County School District
New Construction
Construction
Bristol, Tallahassee, FL 32321

Sugg Middle School Replacement
New Construction
Design
Less than $45,000,000 est. value
Bradenton, FL 34209

Reported 05/22/2020 10:09 AM
Project Title

Davenport Elementary Campus Renovation

Physical Address View project details and contacts
City, State (County) FL   (Polk County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Commenced first quarter 2020
Bids Due View project details and contacts
Estimated Value $20,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for this project includes: demolition, sitework/ underground utilities, landscape/ sod/ irrigation, metal fencing and gates, final cleaning, concrete (flat-work & vertical), masonry (block & brick), structural steel/ handrails, sidewalks, cabinetry and millwork, insulation, roofing & flashing, windows/ glazing, hollow metal/ wood doors & hardware, metal stud framing & drywall, ceramic tile, flooring/ base, acoustical ceilings, painting, markerboards/ tackboards, signage, misc. specialties, projection screens, aluminum walkway canopies, toilet accessories, fire extinguisher and fire extinguisher cabinets, window treatments, elevator, fire protection, plumbing, HVAC, electrical/ low voltage.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents