Similar Projects
Mather Point Campground Loops
Infrastructure
Bidding
$2,000,000 to $5,000,000 est. value
Grand Canyon Village, AZ

National Forest System Road (NFSR) 700 and 91 Road Surfacing
Infrastructure
Bidding
$500,000 to $1,000,000 est. value
Flagstaff, AZ

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Route N21(2) - Kaibeto Chapter - Road Maintenance
Infrastructure
Post-Bid
Kaibito, AZ

JOC - Street Maintenance Projects
Results
Sedona, AZ

Shelby Drive Roadway Improvements Project
Results
$1,644,300 est. value
Sedona, AZ 86336

Antelope Canyon Resort & RV Park
Construction
$2,700,000 est. value
Page, AZ

Regional FFP IDIQ MATOC Roads, Bridges, Construction and Maintenance Sources Sought
Term Contract
Post-Bid
$1,000,000 to $10,000,000 est. value
Flagstaff, Prescott, Rio Verde, AZ - Albuquerque, NM 86301

System Preservation (Restoration/Rehab/Resurface)
Results
$21,000,000 est. value
Flagstaff, AZ 86004

Forest Road Connection Project
Infrastructure
Post-Bid
Sedona, AZ 86351

Guardrail Improvements and Shoulder Widening
Results
$5,400,000 est. value
Pine, AZ 85544

N1012 3.50 Mile to Nanees Dizi, Road Improvement
Infrastructure
Post-Bid
Tuba City, AZ 86045

Coconino Estates Phase II Improvements
Results
Flagstaff, AZ

Los Abrigados to Brewer Road Connection Project
Infrastructure
Post-Bid
$150,000 est. value
Sedona, AZ 86336

Road Construction IDIQ - Coconino & Kaibab National Forests
Results
$1,000,000 to $10,000,000 est. value
Flagstaff, AZ 86001

Last Updated 06/23/2022 09:07 AM
Project Title

Prescott - Flagstaff Highway (SR 89A) (SR 89 - Mp 322)

Physical Address View project details and contacts
City, State (County) Sedona, AZ 86351   (Coconino County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

State Route 89A between milepost 317.40 and 322.43 near Prescott Valley. The proposed work consists of removing the existing asphaltic concrete surface course by milling and replacing it with an Asphaltic Rubber - Asphaltic Concrete Friction Course. The work also includes spot repair work by milling and replacing with asphaltic concrete, pavement markings, and other related work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents