Similar Projects
RFP Design - DOC NCCF Powerhouse Window Replacement
Renovation
Bidding
$250,000 CJ est. value
Des Moines, IA 50319

Remove & Replace Six Overhead Doors for District 4 at multiple locations
Renovation
Sub-Bidding
$150,000 CJ est. value
Ames, IA 50010

Belmont Campus Partial Exterior Window Replacement
Renovation
Sub-Bidding
$300,000 CJ est. value
Davenport, IA 52801

WDMCSD - Stilwell Door Replacement
Alteration
Post-Bid
West Des Moines, IA 50265

State Patrol District (DPS) P09 Window Replacement
Renovation
Post-Bid
$200,000 CJ est. value
Cedar Falls, IA 50613

Madrid Jr/Sr High School Door and Window Replacement - Phase 1
Alteration
Results
Madrid, IA 50156

TMVC Siding Replacement (Toolesboro Mounds Visitor Center)
Alteration
Results
Wapello, IA 52653

Iowa DAS - Window Replacement
Renovation
Post-Bid
$250,000 CJ est. value
Newton, IA 50208

Aluminum Entrance Door Systems
Alteration
Results
Fort Dodge, IA

Remove and Replace Oh Doors and Track at Chariton DOT Facility
Alteration
Post-Bid
$40,000 est. value
Chariton, IA 50049

Remove and Replace OH doors at Repair Shop on Ames DOT Complex
Alteration
Results
$40,000 est. value
Ames, IA 50010

Period Maintenance on Overhead Doors
Term Contract
Post-Bid
Davenport, IA

Viking Lake State Park Lodge Repairs
Alteration
Results
$50,000 est. value
Stanton, IA 51573

Schilletter Village Buildings 18 and 40 Window Replacements
Renovation
Post-Bid
$300,000 CJ est. value
Ames, IA 50010

Tyson Events Center Door Projects
Alteration
Results
$40,000 est. value
Sioux City, IA 51102

Last Updated 09/05/2023 04:04 PM
Project Title

MLK Jr. Transportation Center Window Replacement Project

Physical Address View project details and contacts
City, State (County) Sioux City, IA 51101   (Woodbury County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $25,775 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 5th, 2023 this project is pending an award decision. The City of Sioux City is accepting bids for the MLK Jr. Transportation Center Window Replacement Project. All questions regarding the project, are to be directed to Jason Allen, Project Manager. Bids over $25,000 must be accompanied by a bid bond. PANE REPLACEMENT; REMOVE AND REPLACE 13 BROKEN WINDOW PANES: TO BE REPLACED WITH A COMBINATION OF GLASS AND METAL PANELS PER INCLUDED GRAPHIC. 8 VERTICAL PANES TO BE REPLACED WITH GLASS TO MATCH EXISTING GLASS WINDOWS. 5 HORIZONTAL PANES TO BE REPLACED WITH METAL PANELS. (EXAMPLE OF A SIMILAR INSTALLATION CAN BE VIEWED ON SITE.) MLK JR TRANSPORTATION CENTER PARKING GARAGE STAIRWELL 501 NEBRASKA STREET SIOUX CITY IA 5110 SCOPE OF WORK TO INCLUDE REMOVAL AND DISPOSAL OF EXISTING, ALL LABOR, MATERIALS AND EQUIPMENT TO COMPLETE REPLACEMENT AND INSTALLATION. CONTRACTOR RESPONSIBLE FOR ALL MEASUREMENTS. WORK WILL ALSO INCLUDE REPLACEMENT OF DAMAGED COVERPLATES ON CURTAINWALL.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents