Similar Projects
Walk-In Cooler/Freezer Replacements
Post-Bid
Clearfield, UT 84015

Reassemble the Coal Combustion Unit
Post-Bid
Castle Dale, UT 84513

Heat Exchanger Tube Bundle for Snow College
Results
Ephraim, UT

J--NIIP B2.9L Unit 4 Motor Rewind and Reconconditioni
Results
Salt Lake City, UT 84044

Mountain Crest High School Pool Mechanical Upgrade
Construction
Hyrum, UT

Autoclave (45') Heat Exchanger
Post-Bid
Ogden, UT 84056

Salt Lake Sports Complex Ammonia Chiller Replacement
Results
$300,000 to $500,000 est. value
Salt Lake City, UT 84108

Hydraulic Pumps, Cylinders, Motors and Related Services
Term Contract
Post-Bid
Salt Lake City, UT

Public Safety Condensing Units and Boilers
Results
Less than $110,000 est. value
Orem, UT

Temporary Heating Systems
Post-Bid
Salt Lake City, UT

DFCM Construction-Pre-Qualified Mechanical Contractors-UVU West Campus Condensing Boilers
Results
Less than $290,000 est. value
Heber City, UT

Millville Elementary School Chiller Project
Post-Bid
Millville, UT 84326

Children's Center Boiler Replacement Family Health Building Department of Health
Results
$450,000 est. value
Salt Lake City, UT

Design-Build Mechanical Upgrade at DISA
Post-Bid
$10,000,000 to $25,000,000 est. value
UT

DISA/DECC Ogden Cold Aisle Containment #4 & PDU Install
Results
Sunset, UT 84056

Reported 02/01/2019 12:00 AM
Project Title

F-35 in Line Chillers and Auto Winding Hose Reels

Physical Address View project details and contacts
City, State (County) Ogden, UT 84056   (Weber County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description A requirement is needed to reconfigure existing10 PICUs to permanently Mounted Inline Chillers (MICs) close to the OCC and to build 15 MICs from scratch near each of the OCCs. In the same area of the MIC and OCC the hydraulic hoses racks need to be converted into Auto Wind Hose Reels (AWHR)
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Packaged Water Chillers.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Chillers and Coolers.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents