Similar Projects
Construction of a Five (5) Single-family Housing Development
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Green River, UT 84525

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Construction - Millsite County Road Riprap and Fish Habitat Project
Infrastructure
Bidding
$180,000 CJ est. value
Ferron, UT 84523

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Post-Bid

Construction of the Castle Dale North Chip Seal Project 2022
Infrastructure
Post-Bid
Castle Dale, UT 84513

Udot Region 4 Wash Rack Installation Various Locations
Term Contract, Infrastructure
Results

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

Construction of the CVSSD - City Street Project 2022
Infrastructure
Post-Bid
Castle Dale, UT

Huntington State Park Restrooms Building
Demolition, New Construction, Infrastructure
Results
$698,223 CJ est. value
Huntington, UT 84528

Reclamation of BLM Pits, Rochester, South Moore and Lila Canyon
Infrastructure
Post-Bid
$223,000 est. value
Castle Dale, UT

CC and H Canal Pipeline Installation Project
Infrastructure
Results
$365,551 CJ est. value
Castle Dale, UT 84513

Sidewalk Project, 2022
Infrastructure
Post-Bid
$80,000 CJ est. value
Orangeville, UT 84537

Department of Natural Resources Green River State Park Campground and Lodging Expansion
Addition, Demolition, Infrastructure
Results
$3,676,951 CJ est. value
Green River, UT 84525

Farmington Bay Dyke-Line Restoration
Infrastructure
Post-Bid
$300,000 CJ est. value
Orangeville, UT 84537

Lower Miller Creek BDAs
Infrastructure
Results
$20,000 CJ est. value
Orangeville, UT 84537

Last Updated 02/21/2023 02:29 PM
Project Title

I-70; MP 154.8 to Green River Structure Preservation High Volume

Physical Address View project details and contacts
City, State (County) Green River, UT 84525   (Emery County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,855,799 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

County: Emery This Project Requires Using the Electronic Certified Payroll Program. See Attachment to Notice to Contractors. This is a P+t (Price + Time) Project. The Department Will Not Hold Retention on This Project. Per Utah State Code A 13-8-5 (1) Prime Contractors Cannot Hold Retention. Refer to Utah Code A 13-8-5 (1) for More Information. Wage Rates: Apply Engineer's Estimate: Greater than $1.5M but less than or equal $3M (Qualified Health Insurance Required) Project Location: I-70; MP 154.8 to Green River Structure The principal items of work are as follows (for all items of work see attachment): Emulsified Asphalt (Micro) Micro-Surfacing Road Smoothing The project is to be completed: to be determined by competitive bid Project information can also be reviewed at the main office in Salt Lake City, its Region offices, and its District offices in Price, Richfield, and Cedar City. Each bidder must submit an electronic bid bond from an approved surety company using UDOT's Electronic Bid System (EBS); or in lieu thereof, cash, certified check, or cashier's check for not less than 5% of the total amount of the bid, made payable to the Utah Department of Transportation, showing evidence of good faith and a guarantee that if awarded the contract, the bidder will execute the contract and furnish the contract bonds as required. The right to reject any or all bids is reserved. Additional information may be secured at the office of the Utah Department of Transportation, (801) 965-4346 UDOT - I-70; MP 154.8 to Green River Structure Preservation High Volume *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents