Similar Projects
Fire Suppression System Monitoring & Maintenance, Phoenix Az
Design
Phoenix, AZ

Fire Alarm Upgrade, Phoenix Rearing Facility
Term Contract
Bidding
$250,000 to $500,000 est. value
Phoenix, AZ

Job Order Contract Fire Safety Services
Post-Bid
Mesa, AZ 85211

Fire Extinguishers Service and Maintenance, with Replacement
Post-Bid
Tempe, AZ

Upgrade of the Fire Protection System
Results
Maricopa, AZ 85138

H--Fire Alarm System Testing and Cleaning
Results
Phoenix, AZ 85086

Fire Panel Replacement
Post-Bid
Phoenix, AZ 85008

Fire Pump Replacement Project
Results
Maricopa, AZ 85139

Fire Sprinkler Inspection, Testing and Maintenance
Term Contract
Post-Bid
Phoenix, AZ 85004

Fire Alarm and Energy Manager Program Maintenance
Results
Phoenix, AZ

Lake Annual Fire Alarm Inspections
Term Contract
Post-Bid

Onsite Fire System Upgrade for Liberty Elementary School
Results
Buckeye, AZ 85326

PIMC Kitchen Hood Service
Term Contract
Post-Bid
Phoenix, AZ

Phoenix Sky Harbor International Airport Terminal 4 Infrastructure Fire Alarm Replacement
Alteration
Results
Phoenix, AZ 85034

H112--644 Fire Extinguisher Inspection & Maintenance
Term Contract
Post-Bid
Phoenix, Prescott, AZ - Loma Linda, CA - Albuquerque, NM 85012

Reported 02/19/2022 12:00 AM
Project Title

Annual Fire Protection System Inspection Service(S) for USDA Maricopa, AZ

Physical Address View project details and contacts
City, State (County) Maricopa, AZ   (Maricopa County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Buildings listed below equal approximately 110,000 sq. ft. All listed buildings are fully alarmed and sprinkled. Two office buildings: 1. Building 100 North – 8,611 sq. ft. 2. Building 100 South - 15,200 sq. ft. One main Laboratory building: 1. Building 200 - 45,000 sq. ft. Ancillary buildings: 1. Building 300 - 9,240 sq. ft. 2. Building 400 - 2,404 sq. ft. 3. Building 500 - 5,166 sq. ft. 4. Building 600 - 4,080 sq. ft. 5. Building 800 – HazMat containment 6. Building 900 – Pumphouse (Fire Pump) The fire alarm system is a Janus system. There is a total of 7 risers in the buildings, including one pre-action sprinkler system that services the server room. There is one Patterson 750 GPM fire pump. There are four fire hydrants located at the corners of the facility. A dry chemical system is located in each of two self-contained HAZ Mat buildings. The HAZ MAT buildings are approximately 7’ x 23’ divided into 5 separate rooms each with its own discharge nozzle. There are approximately 44, 10 lb., ABC dry chemical Amerex portable extinguishers located throughout the facility that will require annual service/inspection.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents