Similar Projects
Margate Park Improvements - City of Daly City
Infrastructure
Conception
$5,000,000 est. value
Daly City, CA 94015

Add Third Lagoon Pump and Related Infrastructure - SW-03 - City of Foster City
Renovation
Conception
$2,000,000 est. value
Foster City, CA 94404

3 North - Menlo Park Labs Campus
New Construction, Infrastructure - 260,000 SF
Design
$30,000,000 CJ est. value
Menlo Park, CA 94025

Glens Path Project - Phase 2
Infrastructure
Design
$200,000 CJ est. value
Woodside, CA 94062

Bayfront Park Sanitary Sewer Improvement
Infrastructure
Bidding
$3,642,388 CJ est. value
Menlo Park, CA 94025

Replace Culvert, Drainage and Erosion Control
Infrastructure
Bidding
$18,000,000 CJ est. value
Belmont, CA 94002

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

Replacement of 8-Inch Pipeline Under Pilarcitos Creek (Strawflower) Project
Alteration
Post-Bid
$372,000 est. value
Half Moon Bay, CA 94019

Hopkins Avenue Traffic Calming Project
Alteration
Results
$4,250,000 to $4,680,000 est. value
Redwood City, CA

Bowditch Middle School New Drama and Science Buildings
New Construction, Infrastructure
Results
$15,903,000 CJ est. value
Foster City, CA 94404

South ECR WMR, Phase 1 Sanchez to Barroilhet - City of Burlingame
Infrastructure
Construction
$5,113,000 est. value
Burlingame, CA

Gateway of Pacific Phase 4
Demolition, New Construction, Infrastructure - 345,842 SF
Pending Verification
$88,000,000 CJ est. value
South San Francisco, CA 94080

222 Gateway Terrace Condominiums
Demolition, New Construction, Infrastructure - 54,445 SF
Pending Verification
$15,000,000 CJ est. value
San Mateo, CA 94401

1000 Rollins Pump Station Recommended Improvements - City of Burlingame
Renovation
Conception
$3,291,000 est. value
Burlingame, CA

Repair a Damage Storm Drain System and Rebuild Nearby Eroded Embankment
Infrastructure
Design
$1,092,000 CJ est. value
Half Moon Bay, CA 94019

Last Updated 09/20/2022 08:08 AM
Project Title

Sanitary Sewer Lift Station Rehabilitation - City of San Mateo

Physical Address View project details and contacts
City, State (County) San Mateo, CA 94401   (San Mateo County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Request for Qualifications, Design Development, Construction start expected October 2019
Bids Due View project details and contacts
Estimated Value $8,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Per the owner, as of October 24, 2019, a design team and a general contractor have been selected. Owner states that construction is anticipated to begin in December 2019 or January 2020. *The closed solicitation has been included below for reference: The City of San Mateo (City) is accepting Statements of Qualifications to select a qualified consulting firm or firms to provide professional design services for up to five sanitary sewer lift stations and corresponding force mains within the City. All questions regarding this Request for Qualifications (RFQ) shall be directed to Robert Wiseman, Contract Manager, Clean Water Program, at robert.wiseman@ch2m.com, or to the Public Works Department, City Hall, 330 West 20th Avenue, San Mateo, CA 94403 by September 30, 2016.The method of contractor selection has not been determined at this time.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents