Similar Projects
38--Folsom Dam Backup Emergency Pump, Motor and Coupler
Term Contract
Bidding
Folsom, CA

River Trunk Realignment Shackelford Pump Station
Infrastructure
Bidding
$8,000,670 est. value
Modesto, CA

Southern Pump Station Project
Infrastructure
Post-Bid
$6,200,000 est. value
El Centro, CA 92244

Groundwater Treatment Plant Design-Build (Phase B)
New Construction, Infrastructure
Post-Bid
Anaheim, CA

Grayson Well 69 (Replacing Well 274)
Infrastructure
Results
$2,449,000 est. value
Grayson, Modesto, CA 95363

Treated Water Booster Pumps
Alteration
Results
CA

Water Storage Reservoir and Booster Station Design
Infrastructure
Bidding
$325,000 est. value
Lynwood, CA 90262

Drilling and Construction of Well 32 and 33 Project
Infrastructure
Post-Bid
Colton, San Bernardino, CA 92324

Groundwater Flush to Waste Project
Infrastructure
Results
Sacramento, CA 95838

Rehabilitation of Wells Commission 15 and Commission 18 Project (EO-3489)
Infrastructure
Bidding
$3,515,000 est. value
Long Beach, CA 90807

Well Pumping Plant 31, Fogg Street
Infrastructure
Post-Bid
$1,600,000 to $1,800,000 est. value
Colton, CA 92324

Chilled Water Pump Project
Infrastructure
Results
Marysville, CA 95901

Saugus #3 & #4 Wells Construction (Replacement Wells)
Infrastructure
Bidding
$900,000 to $11,000,000 est. value
Santa Clarita, CA 91350

Well and Pump Maintenance and Repair
Infrastructure
Post-Bid
$114,000 est. value
Napa, Suisun City, CA 94585

CA-Stone Lakes NWR-Pumps Rehab
Term Contract
Results
Elk Grove, CA

Last Updated 01/12/2022 12:26 PM
Project Title

Kern County Water Agency Pioneer Replacement Recovery Water Wells (KCWA 38 & 39)

Physical Address View project details and contacts
City, State (County) Bakersfield, CA 93314   (Kern County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

he CONTRACTOR shall provide all labor, materials, equipment and perform all work necessary to drill two (2) 800-foot deep water wells (KCWA 38 & 39)

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents